Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Hindu Kheda Link Road With Five Year Maintenance
|
| Description |
Construction Of Hindu Kheda Link Road With Five Year Maintenance
|
| Organisation | Chief Engineer PWD Central Zone,Lucknow | State Govt. and UT |
| Tender Id | 2025_CEUCZ_1093600_1 |
|
Reference Number |
6181MT/E-Tender/2025 Dt. 19-11-2025 |
| Tender Fee | 2715 |
| EMD | 4.95 Lakh |
| Tender Value | |
| Place | Unnao |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2010179 |
| Start Date | November 29, 2025 21:30 |
| End Date |
Expired
05/12/2025
Expired 198 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of construction material with poi driver fin yr 2026-27 in gram panchyat kheda barh ramgarh ps gangapur city
Supply of construction material with poi driver fin yr 2026-27 in gram panchyat kheda barh ramgarh ps gangapur city
Read moreConstruction and maintenance of 3 roads 1 construction of amli approach raod to amali usara faliya rd 2 chharchhoda patel faliya road to chharchhoda kheda faliya rd 3 dahod jesavada dhanpur road to chharchhoda talav faliya rd at garbada dahod
Construction and maintenance of 3 roads 1 construction of amli approach raod to amali usara faliya rd 2 chharchhoda patel faliya road to chharchhoda kheda faliya rd 3 dahod jesavada dhanpur road to chharchhoda talav faliya rd at garbada dahod
Read moreSupply installation testing commissioning operation and maintenance of centralized control and monitoring system ccms for highway lighting on national highways under r and b nh wing goa on five 05 year contract basis.
Supply installation testing commissioning operation and maintenance of centralized control and monitoring system ccms for highway lighting on national highways under r and b nh wing goa on five 05 year contract basis.
Read moreConstruction and maintenance of rd road at baghasing sahi to bahadapada under mmsy scheme in the district of gajapati for the year 2026 2027
Construction and maintenance of rd road at baghasing sahi to bahadapada under mmsy scheme in the district of gajapati for the year 2026 2027
Read moreConstruction and maintenance of 1 khandania bhut pagala to itwada falia rd 2 degawada pateda falia to pateda falia rd 3 nadatod kheda falia to sh rd under pmgsy iv talu devgath baria dist dahod
Construction and maintenance of 1 khandania bhut pagala to itwada falia rd 2 degawada pateda falia to pateda falia rd 3 nadatod kheda falia to sh rd under pmgsy iv talu devgath baria dist dahod
Read moreConstruction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Read moreAnnual maintenance of rd road to mithigaon_road_pothole repair with pmc and sc berm filling painting to culverts flank dressingcc pothole repair_0.000 to 4.800 for the year 2026-27
Annual maintenance of rd road to mithigaon road_pothole repair with pmc and sc berm filling painting to culverts flank dressingcc pothole repair_0.000 to 4.800 for the year 2026-27
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreInitial rehabilitation and 5th year maintenance work rudraprayag gaurikund motor road km 15 to chopda bhatgaon motor road
Initial rehabilitation and 5th year maintenance work rudraprayag gaurikund motor road km 15 to chopda bhatgaon motor road
Read morePreparation of dpr of road and bridge from ahmedabad road (govardhan-vilas) to sector 13-14 link road. 2303
Preparation of dpr of road and bridge from ahmedabad road (govardhan-vilas) to sector 13-14 link road. 2303
Read moreof your Industry type