Tender Details
About Tender
🏗️ Invitation For Bids: Rcc Wall Construction At Rajmahal Ocp 🏗️ Eastern Coalfields Limited (Ecil), A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Construction Of A Reinforced Cement Concrete (Rcc) Wall On The Eastern Side Of The Dozer Section Under The Rajmahal Open Cast Project (Rocp). 📅 Bid Submission Deadline: May 25, 2024, 6:55 Pm The Tender Fee Is Non Refundable Inr 24,600. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, In Accordance With The Project's Requirements. Keywords: Construction, Rcc Wall, Eastern Coalfields Limited, Public Sector Undertaking, Rajmahal Ocp, Infrastructure Project, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Constrution Of Rcc Wall East Side Of Dozer Section Under Rocp.
|
Description |
Constrution Of Rcc Wall East Side Of Dozer Section Under Rocp.
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_308235_1 |
Reference Number |
ECL/RJML/AGM/AE(C)/T- Ten/24-25/01 Dt.15.05.2024 |
Tender Fee | 0 |
EMD | 24600 |
Tender Value | |
Place | Rajmahal OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=319388 |
Start Date | May 16, 2024 00:25 |
End Date |
25/05/2024 ( Expired 361 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read more6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read more4lane with paved shoulders from km0.00 ranganathpura (hassan) to km 76.16 (keresooragondanahalli) in hassan-hiriyur section of ec-20 in karnataka on ham under nh (o)
4lane with paved shoulders from km0.00 ranganathpura (hassan) to km 76.16 (keresooragondanahalli) in hassan-hiriyur section of ec-20 in karnataka on ham under nh (o)
Read moreIndependent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through
Independent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through
Read moreTesting and certification of equipments for fulfilling statutory requirements under section 28,29 and 31 of factories act, 1948 and relevant rules of jharkhand factory rule 1950
Testing and certification of equipments for fulfilling statutory requirements under section 28,29 and 31 of factories act, 1948 and relevant rules of jharkhand factory rule 1950
Read moreProvn of prepaid tamper proof electronic meters and connected allied items under ge (east) ferozepur cantt
Provn of prepaid tamper proof electronic meters and connected allied items under ge (east) ferozepur cantt
Read moreof your Industry type