Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
For Construction Of Toe Wall Around Switch Yard And Control Room, Earth Filling And Installation Of Dewatering Pump At 33/11 K V Sub Station Zaidpur District Barabanki
|
| Description |
For Construction Of Toe Wall Around Switch Yard And Control Room, Earth Filling And Installation Of Dewatering Pump At 33/11 K V Sub Station Zaidpur District Barabanki
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_MVVNL_817305_1 |
|
Reference Number |
40/ECC(D)-II/L/Etender/2023-24 |
| Tender Fee | 1180 |
| EMD | 12000 |
| Tender Value | - |
| Place | SE ECC(D)-II MVVNL LKO |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | July 03, 2023 14:30 |
| End Date |
Expired
31/07/2023
Expired 1175 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Raising of odct earth filling supply and spreading of gravel in yard at 33 kv s/stn. naissi
Raising of odct earth filling supply and spreading of gravel in yard at 33 kv s/stn. naissi
Read moreEarth filling at 33 kv s/s building with boundary wall at veerawali, pratapgarh
Earth filling at 33 kv s/s building with boundary wall at veerawali, pratapgarh
Read moreConst of approach earth filling gravelling at 33 kv ss baghera under aen o and m kekri
Const of approach earth filling gravelling at 33 kv ss baghera under aen o and m kekri
Read moreRepair to drain, path, toe walls, earth filling and other allied services at wsa-i, ii and provn of smart periodical services to certain md accn at vayu vihar at af stn adampur
Repair to drain, path, toe walls, earth filling and other allied services at wsa-i, ii and provn of smart periodical services to certain md accn at vayu vihar at af stn adampur
Read moreSw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Read moreFor construction of toe wall around switch yard and control room, earth filling and installation of dewatering
For construction of toe wall around switch yard and control room, earth filling and installation of dewatering pump at 33/11 k v sub station zaidpur district barabanki
Read moreMohalla vasi nagar mein zaidpur barabanki road se vidyut kendra 33/11 zaidpur barabanki tak rcc nali nirman karya
Mohalla vasi nagar mein zaidpur barabanki road se vidyut kendra 33/11 zaidpur barabanki tak rcc nali nirman karya
Read moreMohalla vasi nagar mein zaidpur barabanki road se vidyut kendra 33/11 zaidpur barabanki tak rcc nali nirman karya
Mohalla vasi nagar mein zaidpur barabanki road se vidyut kendra 33/11 zaidpur barabanki tak rcc nali nirman karya
Read moreConstruction of toe wall under plinth beam of existing boundary in front side and earth filling around it at 33 kv malra bass under narnaul circle
Construction of toe wall under plinth beam of existing boundary in front side and earth filling around it at 33 kv malra bass under narnaul circle
Read moreConstruction of toe wall under plinth beam of existing boundary in front side and earth filling around it at 33 kv malra bass under narnaul circle
Construction of toe wall under plinth beam of existing boundary in front side and earth filling around it at 33 kv malra bass under narnaul circle
Read moreof your Industry type