Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Toe Wall Under Plinth Beam Of Existing Boundary In Front Side And Earth Filling Around It At 33 Kv Malra Bass Under Narnaul Circle
|
| Description |
Construction Of Toe Wall Under Plinth Beam Of Existing Boundary In Front Side And Earth Filling Around It At 33 Kv Malra Bass Under Narnaul Circle
|
| Organisation | Haryana Board Corporation | State Govt. and UT |
| Tender Id | 2024_HBC_378312_1 |
|
Reference Number |
20241703AE8E 4065 4E1B B332 98D824EDFF5C1035DHB |
| Tender Fee | 1771 |
| EMD | 4005 |
| Tender Value | - |
| Place | MALRA BASS |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=454286 |
| Start Date | June 18, 2024 22:30 |
| End Date |
Expired
09/07/2024
Expired 831 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Plinth protection including drain around the new office and wall and earthwork (soil filling) on the forest route behind the gate in ward no. 14 sohardr nagar.
Plinth protection including drain around the new office and wall and earthwork (soil filling) on the forest route behind the gate in ward no. 14 sohardr nagar.
Read moreRepair to drain, path, toe walls, earth filling and other allied services at wsa-i, ii and provn of smart periodical services to certain md accn at vayu vihar at af stn adampur
Repair to drain, path, toe walls, earth filling and other allied services at wsa-i, ii and provn of smart periodical services to certain md accn at vayu vihar at af stn adampur
Read moreSw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreConstruction of toe wall under plinth beam of existing boundary in front side and earth filling around it at 33 kv malra bass under narnaul circle
Construction of toe wall under plinth beam of existing boundary in front side and earth filling around it at 33 kv malra bass under narnaul circle
Read moreEarth work in excavation,filling available excavated earth,filling in plinth with sand,dismantling
Read more
Earth work in excavation,filling available excavated earth,supplying and filling in plinth,providin
Read more
Earth work in excavation,filling available excavated earth,supplying and filling in plinth,excavati
Read more
For construction of toe wall around switch yard and control room, earth filling and installation of dewatering
For construction of toe wall around switch yard and control room, earth filling and installation of dewatering pump at 33/11 k v sub station zaidpur district barabanki
Read moreBass badshahpur, hansi2, earth filling in street in front of julana road (vangy)
Bass badshahpur, hansi2, earth filling in street in front of julana road (vangy)
Read moreof your Industry type