Tender Details

Particulars Details
Title
Construction Of Toe Wall Under Plinth Beam Of Existing Boundary In Front Side And Earth Filling Around It At 33 Kv Malra Bass Under Narnaul Circle
Description
Construction Of Toe Wall Under Plinth Beam Of Existing Boundary In Front Side And Earth Filling Around It At 33 Kv Malra Bass Under Narnaul Circle
Organisation Haryana Board Corporation | State Govt. and UT
Tender Id 2024_HBC_378312_1
Reference
Number
20241703AE8E 4065 4E1B B332 98D824EDFF5C1035DHB
Tender Fee 1771
EMD 4005
Tender Value -
Place MALRA BASS
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=454286

Start Date June 18, 2024 22:30
End Date
Expired 09/07/2024

Expired 831 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Plinth protection including drain around the new office and wall and earthwork (soil filling) on the forest route behind the gate in ward no. 14 sohardr nagar.

Plinth protection including drain around the new office and wall and earthwork (soil filling) on the forest route behind the gate in ward no. 14 sohardr nagar.

Read more
Repair to drain, path, toe walls, earth filling and other allied services at wsa-i, ii and provn of smart periodical services to certain md accn at vayu vihar at af stn adampur

Repair to drain, path, toe walls, earth filling and other allied services at wsa-i, ii and provn of smart periodical services to certain md accn at vayu vihar at af stn adampur

Read more
Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc

Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Construction of toe wall under plinth beam of existing boundary in front side and earth filling around it at 33 kv malra bass under narnaul circle

Construction of toe wall under plinth beam of existing boundary in front side and earth filling around it at 33 kv malra bass under narnaul circle

Read more
For construction of toe wall around switch yard and control room, earth filling and installation of dewatering

For construction of toe wall around switch yard and control room, earth filling and installation of dewatering pump at 33/11 k v sub station zaidpur district barabanki

Read more
Bass badshahpur, hansi2, earth filling in street in front of julana road (vangy)

Bass badshahpur, hansi2, earth filling in street in front of julana road (vangy)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise