Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Borewell Construction At Pulikkund Community Hall
|
| Description |
2025 26 Nbp 2025 26. Project No. 23 Borewell Construction At Pulikkund Community Hall In Kayyur Cheemeni Gp.
|
| Organisation | Local Self Government Department | State Govt. and UT |
| Tender Id | 2026_LSGD_827989_2 |
|
Reference Number |
03/AE/LIDEW/NBP/25-26 |
| Tender Fee | 850 |
| EMD | 1843 |
| Tender Value | - |
| Place | LID EW Sub Division Nileswaram |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1389780 |
| Start Date | January 15, 2026 22:30 |
| End Date |
Expired
22/01/2026
Expired 254 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreSupply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreAllied works and compound wall construction for pulikkund community hall
Annual plan-2025-26-nbp allied works and compound wall construction for pulikkund community hall in kayyur-cheemeni gp.-pro no-23/25-26
Read moreNew borewell at old sultan nagar, new community hall, erragadda division.
New borewell at old sultan nagar, new community hall, erragadda division.
Read moreNew borewell at old sultan nagar, new community hall, erragadda division.
New borewell at old sultan nagar, new community hall, erragadda division.
Read moreNew borewell at old sultan nagar, new community hall, erragadda division.
New borewell at old sultan nagar, new community hall, erragadda division.
Read moreof your Industry type