Tender Details
Particulars | Details |
---|---|
Title |
Emergent Restoration Of Valley Side Damages Due To Flash Flood On 4th October 2023 Within 29.00 Km To 33.85 Km Of Nh 10 Under N.H. Division No. Ix In The District Of Kalimpong During The Year 2023 24.
|
Description |
Emergent Restoration Of Valley Side Damages Due To Flash Flood On 4th October 2023 Within 29.00 Km To 33.85 Km Of Nh 10 Under N.H. Division No. Ix In The District Of Kalimpong During The Year 2023 24.
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_MoRTH_776360_1 |
Reference Number |
WBPW_Rd/SE/NHC3/eNIB12/23-24 |
Tender Fee | 10000 |
EMD | 2.97 Lakh |
Tender Value | |
Place | O/o the SE, NHC-III, Matigara, Near Balason Bridge |
Link | https://eprocure.gov.in |
Start Date | October 27, 2023 20:30 |
End Date |
03/11/2023 ( Expired 541 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Emergent repair and restoration of approach slope to puthimari brigde(br. no-22/1) on nh-427, to be d to pr the erosion, occurred due to the rising of flood level , under pwd, guwahati nh division. (job no. 427/as/2024-25/282)
Emergent repair and restoration of approach slope to puthimari brigde(br. no-22/1) on nh-427, to be d to pr the erosion, occurred due to the rising of flood level , under pwd, guwahati nh division. (job no. 427/as/2024-25/282)
Read moreSankrail manikpur hirapur bazar road from 0.20 km to 0.50 km, emergent temporary restoration work in various stretches for laying of phe pipeline of howrah highway sub-division of howrah highway division in the dist. of howrah during the year 2025-26
Sankrail manikpur hirapur bazar road from 0.20 km to 0.50 km, emergent temporary restoration work in various stretches for laying of phe pipeline of howrah highway sub-division of howrah highway division in the dist. of howrah during the year 2025-26
Read morePerformance based maintenance work 05 years contract period from chainage km 0.00 to km 34.00 of n.h. 55 -new n.h. 110- under n.h. division-ix in the district of darjeeling, west bengal during the year 2024-25 -job no. pbmc-110-wb-2024-25-563.
Performance based maintenance work 05 years contract period from chainage km 0.00 to km 34.00 of n.h. 55 -new n.h. 110- under n.h. division-ix in the district of darjeeling, west bengal during the year 2024-25 -job no. pbmc-110-wb-2024-25-563.
Read moreShort term maintenance work from km 670.00 to km 674.175 of nh-31 -new nh-717 under nh division-ix in the district of jalpaiguri, west bengal during the year 2024-25 -job no. nh-717-wb-2024-25-stmc-15.
Short term maintenance work from km 670.00 to km 674.175 of nh-31 -new nh-717 under nh division-ix in the district of jalpaiguri, west bengal during the year 2024-25 -job no. nh-717-wb-2024-25-stmc-15.
Read moreConstruction of 3 _three_ nos. new single cell type box culvert _2.0 m x 3.0 m_ at km 54.150 km 54.750 and km 55.150 of nh-117 including improvement of flaring portion on either side of each culvert during the year 2024_2025 under n.h division no._i
Construction of 3 _three_ nos. new single cell type box culvert _2.0 m x 3.0 m_ at km 54.150 km 54.750 and km 55.150 of nh-117 including improvement of flaring portion on either side of each culvert during the year 2024_2025 under n.h division no._i
Read moreEmergent restoration of depressed portion
Emergent restoration of depressed portion at chainage km 4.25 to km 4.31 and km 4.36 to km 4.38 of nh 55 (new nh 110) under nh division ix in the district of darjeeling during the year 2024-25.
Read moreMirik bye pass road, emergent restoration of land slides at ch. 0.50 km due to heavy rainfall
Mirik bye pass road, emergent restoration of land slides at ch. 0.50 km due to heavy rainfall under darjeeling highway division in the district of darjeeling during the year 2024-25.
Read moreConstruction of 3 three nos. new single cell type box culvert 2.0 m x 3.0 m at km 54.150 km 54.750 and km 55.150 of nh 117 including improvement of flaring portion on either side of each culvert during the year 2024 2025 under n.h division no. i in
Construction of 3 three nos. new single cell type box culvert 2.0 m x 3.0 m at km 54.150 km 54.750 and km 55.150 of nh 117 including improvement of flaring portion on either side of each culvert during the year 2024 2025 under n.h division no. i in
Read morePr of pmgsy road from rabindranagar to bhuyacherra (link no l050, length 2.288 km) under jmupui hill sub division during the year 2023 24 sh wbm 3, carpeting, seal coating, road side pucca etc. (2nd call.)
Pr of pmgsy road from rabindranagar to bhuyacherra (link no l050, length 2.288 km) under jmupui hill sub division during the year 2023 24 sh wbm 3, carpeting, seal coating, road side pucca etc. (2nd call.)
Read moreStmc 2024-25-thane division loose scale repairs on nh - 61 by restoration of flood damages by removing hanged boulders, loose scaling material along kalyan murbad nirmal road n.h. 61 in malshej ghat stretches in the district of thane.
Stmc 2024-25-thane division loose scale repairs on nh - 61 by restoration of flood damages by removing hanged boulders, loose scaling material along kalyan murbad nirmal road n.h. 61 in malshej ghat stretches in the district of thane.
Read moreof your Industry type