Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sr. Den/North/Sbc Section : Chikka Banavara (Baw) Station : Proposed Extension Of High Level (Hl) Platform At Baw, Pf 1 By 140 M, Pf 2 And 3 By 140 M, Pf 4 By 60 M [Total 340 Mtr), To Operate 24 Coach Length Trains At Baw Station. Maintenance Period Is 6 Months
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 76432699 |
|
Reference Number |
15SBC24OF25-07-24Item-01 |
| Tender Fee | 0 |
| EMD | 1.51 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76432699/viewNitPdf_4654298.pdf |
| Start Date | July 25, 2024 21:14 |
| End Date |
Expired
19/08/2024
Expired 739 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sr. den/north/sbc section : chikka banavara (baw) station : proposed extension of high level (hl) platform at baw, pf-1 by 140 m, pf - 2 and 3 by 140 m, pf - 4 by 60 m [total - 340 mtr), to operate 24 coach length trains at baw station. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreAden/kunigal : zone c : annual repairs/maintenance of staff quarters and service buildings under the jurisdiction of chikka banavara jn (baw) [exc] - hassan (has) [excl]
For complete deion and other details, please refer to tender
Read more[i]ohe modification required for construction of track machine siding at baw, yy, sbga and nmga station length of 420m [ii]ohe modification in connection with the proposed extension of platform bgnr pf-1&2 by mtr, hise pf-1, 2&3 by 20 mtr, sbga pf-1, pf-2&3 by 138m each, cnpa pf-1, 2&3 by 140 mtr and compound wall at cnpa station in aden/kigl subdivision. [iii]pending works after electrification of baw-has(gr296) sections of sbc division. [iv]trd works in connection with engine
For complete deion and other details, please refer to tender
Read more[i]ohe modification required for construction of track machine siding at baw, yy, sbga and nmga station length of 420m [ii]ohe modification in connection with the proposed extension of platform bgnr pf-1&2 by 16 mtr, hise pf-1, 2&3 by 20 mtr, sbga pf-1, pf-2&3 by 138m each, cnpa pf-1, 2&3 by 140 mtr and compound wall at cnpa station in aden/kigl subdivision. [iii]pending works after electrification of baw-has(gr296) sections of sbc division. [iv]trd works in connection with eng
For complete deion and other details, please refer to tender
Read moreSw i : chikkabanavara - hassan section : pro. extension of hl platform for nelamangala (nmga) station pf-1 by 140 mtr, kunigal (kigl) station pf - 1, 2 and 3 by 20mtr, yediyuru (yy) station pf - 1, 2 and 3 by 40 mtr in aden/kunigal subdivision. sw ii : chikkabanavara - hassan section : pro. extension of platform for b g nagar (bgnr) station pf-1 and 2 by 16 mtr, hirisave (hise) pf-1, 2 and 3 by 20 mtr, sharavanabelagola (sbga) station pf-1, 2 and 3 by 138m each, channarayapatna (cnpa) pf-1,
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : re-profiling and protection of slope by providing turfing at km 39/100-41/400. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc jurisdiction : sw i : aden/yesvanthpur sub-division : proposed construction of toilets for divyang persons at heggere halt (hei), mallasandra (mlsa), gubbi (gbb), nittur (ntr), sampige road (spgr) and yelahanka (ynk) pf no. 4/5 stations. sw ii : aden/yesvanthpur sub-division : provision of divyangjan facilities like toilets, drinking water booths, railing, non-slippery walkways, ramps and trolley path at chikka banavara (baw), golhalli (ghl), dodbele (dbl), nidavanda (ndv), d
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : construction of rub (rcc box size : 1 x 7.50 x 4.50m) at km 14/300-400 at nelamangala (nmga station) by rolling in / launching method. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreChikka banavara - hassan section : proposed extension of ballast depot (210m x 18m) and approach road (400m x 4.5m) at hirisave (hise) in aden/kigl sec, under den/south/sbc jurisdiction. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreRaising and extension of existing rail level pf no. 2 to high level pf of size 450 m x 8 m at gautamdhara station.
For complete deion and other details, please refer to tender
Read moreof your Industry type