Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Invitation For Bids: Lift Dismantling, Shifting, And Re Erection At Raichur Railway Station 🛠️ The Ministry Of Railways, Central Government, Invites Bids From Experienced Contractors For The Complete Dismantling, Shifting, And Re Erection Of A 13 Passenger Capacity Lift From The Existing Old Fob To The New Fob At Platform No. 1 And Pf 2 & 3 At Raichur Railway Station. 📅 Bid Submission Deadline: July 17, 2024, 3:00 Pm A Tender Fee Of Inr 40,100 Must Be Submitted With The Earnest Money Deposit (Emd) To Participate. Interested Bidders Should Review The Complete Tender Document For Detailed Specifications, Terms, And Conditions. Keywords: Lift Dismantling, Shifting, Re Erection, Ministry Of Railways, Central Govt. Ministry/Department, Railway Station, Tender, Bid, Emd, Procurement| Particulars | Details |
|---|---|
| Title |
Guntakal Division:Dismantling Shifting And Re Erection Of 13 Passenger Capacity Lift From Existing Old Fob To New Fob At Platform No.1 &Amp Pf 2&Amp3 Raichur Railway Station.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75811003 |
|
Reference Number |
GTL-EM-16-2024-25 |
| Tender Fee | 0 |
| EMD | 40100 |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75811003/viewNitPdf_4613929.pdf |
| Start Date | June 25, 2024 18:02 |
| End Date |
Expired
17/07/2024
Expired 823 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rajkot division : allied work of (a) provision of escalators pairs of 12 m wide fob at rajkot, (b) provision of single escalators for pf 1, pf 2/3 and pf 4/5 at rajkot, for pf 1 and pf 2 at jamnagar & (c) lift 12 m wide fob at rajkot & jamnagar
Rajkot division : allied work of (a) provision of escalators pairs of 12 m wide fob at rajkot, (b) provision of single escalators for pf 1, pf 2/3 and pf 4/5 at rajkot, for pf 1 and pf 2 at jamnagar & (c) lift 12 m wide fob at rajkot & jamnagar
Read moreConstruction of platform no-02(h.l) and fob connection between pf-1 and pf-2 at bilaspur road in jurisdiction of aden/kpv in izzatnagar division of n.e.railway.
Construction of platform no-02(h.l) and fob connection between pf-1 and pf-2 at bilaspur road in jurisdiction of aden/kpv in izzatnagar division of n.e.railway.
Read more1) provision of two lifts each at panp, jru, byd and ntw railway stations on the existing fob (total 8 lifts). 2) provision of one lift each at pf-1 and pf-2 on existing fob at ajp and one lift on main entry to railway station at dru (total-3 lifts).
1) provision of two lifts each at panp, jru, byd and ntw railway stations on the existing fob (total 8 lifts). 2) provision of one lift each at pf-1 and pf-2 on existing fob at ajp and one lift on main entry to railway station at dru (total-3 lifts).
Read moreExtension of fob, pf shed, ramp and circulating area in connection with the work of utility shifting and renovation work at bankura station yard in adra division.
Extension of fob, pf shed, ramp and circulating area in connection with the work of utility shifting and renovation work at bankura station yard in adra division.
Read moreSecunderabad division electrical maintenance department - (i) oea-development -development of odela railway station with facilities of nsg-4 category (ii) oea-fob - ramp - proposal for contraction of 2.4 m wide ramp at existing fob at odela station (iii) asaf-srur pf - raising of platform from medium level to high level at asaf (pf1) & srur(pf3) in sr.den/north jurisdiction (iv) rechini road - raising of platform no 1 from ml to hl pf at rech in sr.den/north jurisdiction. & proposed
Secunderabad division electrical maintenance department - (i) oea-development -development of odela railway station with facilities of nsg-4 category (ii) oea-fob - ramp - proposal for contraction of 2.4 m wide ramp at existing fob at odela station (iii) asaf-srur pf - raising of platform from medium level to high level at asaf (pf1) & srur(pf3) in sr.den/north jurisdiction (iv) rechini road - raising of platform no 1 from ml to hl pf at rech in sr.den/north jurisdiction. & proposed
Read moreSignalling work in connection with (1)extension of high level passenger platform at nardana paldhi under the section of aden/amalner (2)ukaisonghad-jalgaon sec- extension of pf.1 an & pf 2 dxg with shelter hut covershed on pf (3)amalner- upgradation development of station entry, pf surfacing work and extension of cop (phase-ii) of udhana-jalgaon section of mumbai division, western railway
Signalling work in connection with (1)extension of high level passenger platform at nardana paldhi under the section of aden/amalner (2)ukaisonghad-jalgaon sec- extension of pf.1 an & pf 2 dxg with shelter hut covershed on pf (3)amalner- upgradation development of station entry, pf surfacing work and extension of cop (phase-ii) of udhana-jalgaon section of mumbai division, western railway
Read moreElectrical work in c/w provision of minimum essential amenities at various stations of bkn div to recoup shortfall in the jurisdiction of den/east/bkn, provision of high level island passenger platform & other passenger amenities between line no. 9 & 10 & extension of platform no.6 at hisar station, raising of pf no. 1 at lahli & bamla station to high level & extension to accommodate full length trains & raising of pf no. 1 at dhana ladanpur halt station & extension
Electrical work in c/w provision of minimum essential amenities at various stations of bkn div to recoup shortfall in the jurisdiction of den/east/bkn, provision of high level island passenger platform & other passenger amenities between line no. 9 & 10 & extension of platform no.6 at hisar station, raising of pf no. 1 at lahli & bamla station to high level & extension to accommodate full length trains & raising of pf no. 1 at dhana ladanpur halt station & extension
Read moreS&t work in connection with (i) installation of an electronic in-motion weigh-bridge (eimwb) at bksc loco line in adra division; (ii) utility shifting and renovation work for fob, pf, circulating area, pipeline, etc., at bankura station yard in adra division.
S&t work in connection with (i) installation of an electronic in-motion weigh-bridge (eimwb) at bksc loco line in adra division; (ii) utility shifting and renovation work for fob, pf, circulating area, pipeline, etc., at bankura station yard in adra division.
Read moreOhe modification work against sanctioned works under ph-53 over firozpur division in c/w (i)- raising of passenger platform from rl/ll to hl pass. pf at 08 stations blnd, kupr, ldw, bhm, jjj, gsr, kash, scq & mxp under sr.den-i/fzr, (ii)- provision of standard ramp for passenger to existing fob at 06 stations hussainpur, sultanpur lodhi, lohian khas, malawala khas, firozpur city & jalalabad under den/hq/fzr and (iii)- provision of standard ramp for passanger to existing fobs at 06 stat
Ohe modification work against sanctioned works under ph-53 over firozpur division in c/w (i)- raising of passenger platform from rl/ll to hl pass. pf at 08 stations blnd, kupr, ldw, bhm, jjj, gsr, kash, scq & mxp under sr.den-i/fzr, (ii)- provision of standard ramp for passenger to existing fob at 06 stations hussainpur, sultanpur lodhi, lohian khas, malawala khas, firozpur city & jalalabad under den/hq/fzr and (iii)- provision of standard ramp for passanger to existing fobs at 06 stat
Read moreDesign, manufacture, supply, installation, testing, and commissioning of a 14-passenger capacity lift (952 kg) for the foot over bridge (fob) inside the station building. all structures, components, dimensions, testing protocols, inspections, and compliance conditions must strictly adhere to specification no. rdso/2013/em/spec/0016 (rev 2)-2025 dated 25.09.2025 (or the latest amendment). approved makes: only equipment from the following approved manufacturers will be accepted: johnson, schindl
Design, manufacture, supply, installation, testing, and commissioning of a 14-passenger capacity lift (952 kg) for the foot over bridge (fob) inside the station building. all structures, components, dimensions, testing protocols, inspections, and compliance conditions must strictly adhere to specification no. rdso/2013/em/spec/0016 (rev 2)-2025 dated 25.09.2025 (or the latest amendment). approved makes: only equipment from the following approved manufacturers will be accepted: johnson, schindl
Read moreof your Industry type