Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Guntakal Divn: Dismantling Shifting And Re Erection Of 13 Passenger Capacity Lift From Existing Old Fob To New Fob On Pf No: 4 Of Anantapur Railway Station.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76799239 |
Reference Number |
GTL-EM-22-2024-25 |
Tender Fee | 0 |
EMD | 27000 |
Tender Value | |
Place | Secunderabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/092024/76799239/viewNitPdf_4677731.pdf |
Start Date | August 13, 2024 23:37 |
End Date |
04/09/2024 ( Expired 304 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreDevelopment, operation and maintenance of ropeway project from kamakhya railway station to kamakhya temple on dbfot mode in the state of assam.
Development, operation and maintenance of ropeway project from kamakhya railway station to kamakhya temple on dbfot mode in the state of assam.
Read moreConsultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Read moreModification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Read moreShifting/di of existing utilities such as sewer line, water pipelines, storm water line etc. and execution of enabling miscellaneous civil work from haryana border(near mcdtoll nh-48) to rajiv chowk namo bharat station for namo bharat corridor
Shifting/di of existing utilities such as sewer line, water pipelines, storm water line etc. and execution of enabling miscellaneous civil work from haryana border(near mcdtoll nh-48) to rajiv chowk namo bharat station for namo bharat corridor
Read moreConstruction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)
Construction of 4 new foot over bridges in&#x0d indore on design, built, operate and transfer&#x0d basis and maintenance of existing three fobs&#x0d for license period of 10 years (extendable to&#x0d five years)
Read moreReplacement of existing 1 no of 8 persons passenger lift (vip lift) and 2 nos of 13 persons passenger lifts with new 1 no of 8 persons passenger lift (vip lift) and 2 nos of 13 persons passenger lifts and their related accessory in cmwssb head office
Replacement of existing 1 no of 8 persons passenger lift (vip lift) and 2 nos of 13 persons passenger lifts with new 1 no of 8 persons passenger lift (vip lift) and 2 nos of 13 persons passenger lifts and their related accessory in cmwssb head office
Read moreE tender for dismantling, design, manufacture, sitc and handing over of 1 no. 26 persons capacity bed-cum passenger lift at main hospital with 3 years camc after one year guarantee period in chpa
E tender for dismantling, design, manufacture, sitc and handing over of 1 no. 26 persons capacity bed-cum passenger lift at main hospital with 3 years camc after one year guarantee period in chpa
Read moreRaising strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.
Raising, strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.
Read moreof your Industry type