Tender Details
Particulars | Details |
---|---|
Title |
Maintenane And Painting Work In Govt Non Residential Building (Nrb) Ten Court Building Maihar Under Sub Division Maihar
|
Description |
Maintenane And Painting Work In Govt Non Residential Building (Nrb) Ten Court Building Maihar Under Sub Division Maihar
|
Organisation | PWD- Roads and Bridges | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2295 |
EMD | 34200 |
Tender Value | |
Place | satna |
Link |
AAAAAAAAAA Login to view |
Start Date | May 21, 2025 15:30 |
End Date |
04/06/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreConstruction of non-residential building of tehsil bhatwari, damaged due to disaster in district uttarkashi under c.m announcement no. 37/2017.
Construction of non-residential building of tehsil bhatwari, damaged due to disaster in district uttarkashi under c.m announcement no. 37/2017.
Read moreTsgp-31/ rdss/2025-26
Development of distribution infrastructure of 11 kv feeders (urban and industrial) emanating from 66 kv sub-stations sector 1,2,3,4,8 in imt manesar of gurugram-1 circle, dhbvn under rds scheme.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreConstruction of 3 tpd material recovery facility center , compost plant and other work under sbm 2.0 in shahganj.
Construction of 3 tpd material recovery facility center , compost plant and other work under sbm 2.0 in shahganj.
Read moreConstruction and strengthening work
Construction and strengthening work of mrf and composting plant under swachh bharat mission urban 2.0 in ulb area
Read moreConstruction and development work under cm infra phase 4 in raisen road work, building work, other component
Construction and development work under cm infra phase 4 in raisen road work, building work, other component
Read moreAAAAAAAAAA
Login to viewConstruction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park along with fencing work at debi ghat at ch. 0.50 km of kazi nazrul islam avenue of v.i.p road under barasat highway division no. i in the district of
Read morePerformance based maintenance contract (pbmc) work on nh 02 (old nh 61) from km 125.000 to km 135.000 (length 10.00 km) under nh division ii mokokchung in the state of nagaland
Performance based maintenance contract (pbmc) work on nh 02 (old nh 61) from km 125.000 to km 135.000 (length 10.00 km) under nh division ii mokokchung in the state of nagaland
Read moreof your Industry type