Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Construction Of New Box Culvert At Ch.18.60 Km Of Trihana Naxalbari Road Under North Bengal Construction Division In The District Of Darjeeling.
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 96574 |
Tender Value | |
Place | TRIHANA NAXALBARI ROAD |
Link |
AAAAAAAAAA Login to view |
Start Date | July 09, 2025 00:25 |
End Date |
25/07/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConstruction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Read moreConstruction of lvup at ch. 364.875 lhs and ch. 364.990 lhs on rob approaches and service road as safety measures for rectification of blackspot at jokatte cross morth id ka02 048) near baikampady rob in the state of karnataka
Construction of lvup at ch. 364.875 lhs and ch. 364.990 lhs on rob approaches and service road as safety measures for rectification of blackspot at jokatte cross morth id ka02 048) near baikampady rob in the state of karnataka
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreBalance work of rectification of blackspot by construction of approach road with re wall at sathoor junction flyover from ch. 201.050 to 202.005 (bhs) on deoli kota section from km 167.624 to km 250.144 of nh 52 in the state of rajasthan on epc mode
Balance work of rectification of blackspot by construction of approach road with re wall at sathoor junction flyover from ch. 201.050 to 202.005 (bhs) on deoli kota section from km 167.624 to km 250.144 of nh 52 in the state of rajasthan on epc mode
Read moreWbpwd/pw(r)/se/shc/nit no 11 of 2025-2026(sl no-02)
Domjur andul road from 4.30 km to 7.30 km, restoration work of phe cutting for laying pipe line under howrah highway division in the district of howrah
Read moreof your Industry type