Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 02 Lane Rail Over Bridge At Lc No 81 B Excluding Railway Portion On Bhagwa Chungi Chauraha To Bhagwa Village And Additional Leaf Of 02 Lane Bridge On Railway Colony Sahodarpur Marg In Distt Pratapgarh On Epc Mode
|
| Description |
Construction Of 02 Lane Rail Over Bridge At Lc No 81 B Excluding Railway Portion On Bhagwa Chungi Chauraha To Bhagwa Village And Additional Leaf Of 02 Lane Bridge On Railway Colony Sahodarpur Marg In Distt Pratapgarh On Epc Mode
|
| Organisation | UP STATE BRIDGE CORPORATION LIMITED | State Govt. and UT |
| Tender Id | 2024_UPSBC_884264_1 |
|
Reference Number |
1536/E-TENDER/CPM AYODHYA/2023-24 DT 20.01.2024 |
| Tender Fee | 11800 |
| EMD | 35.91 Lakh |
| Tender Value | - |
| Place | PARTAPGARH |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1513517 |
| Start Date | January 23, 2024 23:30 |
| End Date |
Expired
14/02/2024
Expired 974 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Read moreConst. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Read moreDevelopment of roundabout, junction improvement and lane widening for long term rectification of blackspot no. 464 (gram arjun nala/railway bridge) on silwani- katangi - bonkatta road under chhindwara division
Development of roundabout, junction improvement and lane widening for long term rectification of blackspot no. 464 (gram arjun nala/railway bridge) on silwani- katangi - bonkatta road under chhindwara division
Read moreModification to the existing ohe in connection with the construction of two lane rub between atgaon & thansit at kmm.98/2 in kalamgaon at hydraulic bridge on kalyan-manmad section mumbai division of central railway
Modification to the existing ohe in connection with the construction of two lane rub between atgaon & thansit at kmm.98/2 in kalamgaon at hydraulic bridge on kalyan-manmad section mumbai division of central railway
Read moreConstruction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Read moreConstruction of foundation sub strucutre super structure r e wall service road drain electrification and view cutter on 02 lane rob lc no 81 b excluding rly portion on bhagwa chungi chauraha bhangwa village in distt pratapgarh
Construction of foundation sub strucutre super structure r e wall service road drain electrification and view cutter on 02 lane rob lc no 81 b excluding rly portion on bhagwa chungi chauraha bhangwa village in distt pratapgarh
Read moreDevelopement of lane no 01,02,03, and 05 of zum zum colony rawalpora near mounchwa railway bridge
Developement of lane no 01,02,03, and 05 of zum zum colony rawalpora near mounchwa railway bridge
Read moreC/o road/lane from railway bridge to lo gh mohuiddin ganai and others sadoora block vessu
C/o road/lane from railway bridge to lo gh mohuiddin ganai and others sadoora block vessu
Read moreC/o road/lane from railway bridge to lo gh mohuiddin ganai and others sadoora block vessu
C/o road/lane from railway bridge to lo gh mohuiddin ganai and others sadoora block vessu
Read moreC/o road/lane from railway bridge to lo gh mohuiddin ganai and others sadoora block vessu
C/o road/lane from railway bridge to lo gh mohuiddin ganai and others sadoora block vessu
Read moreof your Industry type