Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Under District Barabanki, Construction Work Of Cc Road In Gata No. 106 Of Village Pahadpur Majre Saher, The Boundary Wall Of Ambedkar Park And From The Gate Of The Park To The Statue Of Baba Saheb, Lot No 2
|
Description |
Under District Barabanki, Construction Work Of Cc Road In Gata No. 106 Of Village Pahadpur Majre Saher, The Boundary Wall Of Ambedkar Park And From The Gate Of The Park To The Statue Of Baba Saheb, Lot No 2
|
Organisation | Director Cum Chief Engineer RED | State Govt. and UT |
Tender Id | 2025_REDUP_1048170_1 |
Reference Number |
259/EE RED BARABANKI/2025-26 Dt 20/05/2025 |
Tender Fee | 854 |
EMD | 38000 |
Tender Value | |
Place | Barabanki |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1904453 |
Start Date | June 13, 2025 21:30 |
End Date |
19/06/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Under infrastructure fund talpura road housing development scheme in jhansi district repair strengthening work of roads in jhansi rcc drain construction work behind paramedical boundary wall in nagar nigam jhansi mauja scheme no 3 road strengthening
Under infrastructure fund talpura road housing development scheme in jhansi district repair strengthening work of roads in jhansi rcc drain construction work behind paramedical boundary wall in nagar nigam jhansi mauja scheme no 3 road strengthening
Read moreConstruction of boundary wall from gate no-2(cisf gate) to ash weigh bridge/railway gate at dvc, mtps.
Construction of boundary wall from gate no-2(cisf gate) to ash weigh bridge/railway gate at dvc, mtps.
Read moreUnder district sultanpur, construction road from village lakhicha to dubey ka purva of block kurebhar, lot no 1
Under district sultanpur, construction road from village lakhicha to dubey ka purva of block kurebhar, lot no 1&#x0d
Read moreLaying of cc drain from d.no. 22-11-66 to sai baba temple, poolavanigunta, cotton mill main road in ward no.2. 15th fc 2023-24 (1st installment) untied grant.(2nd call).
Laying of cc drain from d.no. 22-11-66 to sai baba temple, poolavanigunta, cotton mill main road in ward no.2. 15th fc 2023-24 (1st installment) untied grant (2nd call).
Read moreN.i.t. no.04 of 2025-26 of e.e./p.w.d./t.b.c.d.
Huzur saheb link road (vr) renovation work by surfacing from ch. 0.00 km to 0.70 km under teesta bridge construction division, pwd, in the district of cooch behar during the year 2024-2025.(2nd call)
Read moreUnder district bahraich ,construction of cc road from the house of advocate madan gopal verma to the dinesh lodhi farm in village pt kudwa under block mihimpurwa, lot no 4
Under district bahraich ,construction of cc road from the house of advocate madan gopal verma to the dinesh lodhi farm in village pt kudwa under block mihimpurwa, lot no 4&#x0d
Read moreConstruction of boundary wall,tiles and cc road etc work at jaderua shamshanghat ward no.19 zone no.08.file no.114/25x3/3.
Construction of boundary wall,tiles and cc road etc work at jaderua shamshanghat ward no.19 zone no.08.file no.114/25x3/3.
Read moreRepair work of plant godown no.-1, no.-2,no.-3,godown no.4,no.5,no.-6,no.-7,no.-8, no.-9,no.-10,no.-11,no.-12 and const.of boundary wall with gate i/c insttalation of sign board, const.of drain and cc road with culvert of markfed at govindpura,bhopal
Repair work of plant godown no.-1, no.-2,no.-3,godown no.4,no.5,no.-6,no.-7,no.-8, no.-9,no.-10,no.-11,no.-12 and const.of boundary wall with gate i/c insttalation of sign board, const.of drain and cc road with culvert of markfed at govindpura,bhopal
Read moreUnder district jaunpur, construction of road from cc road to sharma basti and lal bahadur yadav house in block sikrara village belsari, lot no 1
Under district jaunpur, construction of road from cc road to sharma basti and lal bahadur yadav house in block sikrara village belsari, lot no 1&#x0d
Read moreProviding chain link fencing from cprc compound to lsfm c yard east side gate and removing the existing damaged barbed wire fencing and solid block work over the existing compound wall at eastern side of br no.2 (phase ii) at tnpl unit i
Providing chain link fencing from cprc compound to lsfm c yard east side gate and removing the existing damaged barbed wire fencing and solid block work over the existing compound wall at eastern side of br no.2 (phase ii) at tnpl unit i
Read moreof your Industry type