Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 4 Lane Western Bypass Of Gwalior From Km 0.000 To Km 28.516 In The State Of Madhya Pradesh On Ham Mode.
|
| Description |
Construction Of 4 Lane Western Bypass Of Gwalior From Km 0.000 To Km 28.516 In The State Of Madhya Pradesh On Ham Mode.
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_224491_1 |
|
Reference Number |
MPDIV-20015/17 /2024-MP Division-Part(1) |
| Tender Fee | 80000 |
| EMD | 7.92 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=250976 |
| Start Date | January 21, 2025 22:10 |
| End Date |
Expired
20/03/2025
Expired 572 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreUpgradation from 2-lane ps to 4-lane ps of bagdogra panitanki kharibari galgalia section of nh-327 in the state of west bengal on ham mode under nh(o)
Upgradation from 2-lane ps to 4-lane ps of bagdogra panitanki kharibari galgalia section of nh-327 in the state of west bengal on ham mode under nh(o)
Read moreConstruction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode
Construction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode
Read moreConstruction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Read moreDevelopment of 4/6 lane green field bypass for etmadpur and tundla town on section of agra etawah nh 19 from design km. 0.000 to km. 16.200 in the state of uttar pradesh on epc mode.
Development of 4/6 lane green field bypass for etmadpur and tundla town on section of agra etawah nh 19 from design km. 0.000 to km. 16.200 in the state of uttar pradesh on epc mode.
Read moreConstruction of 6 lane road tunnel for nh 148ae connecting dwarka expressway nh 248bb with nelson mandela marg vasant kunj in the state of delhi on ham mode
Construction of 6 lane road tunnel for nh 148ae connecting dwarka expressway nh 248bb with nelson mandela marg vasant kunj in the state of delhi on ham mode
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreUpgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Read moreConst of 4/6l gf ludhiana rupnagar nh 205k from jn with ne to manewal (ludhiana) to jn with nh205 near bheora (rupnagar) with ludhiana bypass under nh(o) in punjab on ham pkg 2 dc 37.700 to 66.440 and ludhiana bypass dc. 0.000 to 18.500 tl 47.240 km
Const of 4/6l gf ludhiana rupnagar nh 205k from jn with ne to manewal (ludhiana) to jn with nh205 near bheora (rupnagar) with ludhiana bypass under nh(o) in punjab on ham pkg 2 dc 37.700 to 66.440 and ludhiana bypass dc. 0.000 to 18.500 tl 47.240 km
Read moreof your Industry type