Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pole Dismantling,Pole Erection,Cement Concrete,Soft Loose Soil,Hard Dense Soil,Hard Rock,Earthing,6
|
| Description |
|
| Organisation | Department of Defence | Ministry of Defence |
| Tender Id | GEM/2023/B/3875646 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | August 25, 2023 22:11 |
| End Date |
Expired
14/09/2023
Expired 1125 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | A T S ELECTRICALS COMPANY | - | 12-09-2023 16:57:32 | Registered with designated Agency / Authority | MII N/A | Qualified |
| 2 | Amruta Enterprises | - | 11-09-2023 12:24:23 | Registered with designated Agency / Authority | MII N/A | Qualified |
| 3 | GAUHANE ELECTRICALS AND CONTRACTORS | - | 13-09-2023 12:24:45 | Registered with designated Agency / Authority | MII N/A | Qualified |
| 4 | K D ENTERPRISES | - | 14-09-2023 07:35:05 | Registered with designated Agency / Authority | MII N/A | Disqualified |
| 5 | POWERTECH ENGINEERS | - | 13-09-2023 20:49:45 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 6 | SARTHAK ELECTROMECH PRIVATE LIMITED | - | 14-09-2023 15:28:36 | Offline upload | MII | Disqualified |
| 7 | SHIKILKAR ELECTRICALS | - | 14-09-2023 11:40:34 | Registered with designated Agency / Authority | MII N/A | Disqualified |
| 8 | SHRI SIDDHIVINAYAK SUPPLIERS AND SERVICES | - | 13-09-2023 22:04:56 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 9 | SOHAM ENTERPRISES | - | 14-09-2023 16:41:17 | Registered with designated Agency / Authority | MII N/A | Disqualified |
| 10 | SUDEEP ENGINEERS | - | 11-09-2023 07:58:10 | BIS License | MII MSE | Disqualified |
| 11 | TANGENT ELECTRICALS AND CONTRACTOR | - | 14-09-2023 14:16:08 | Offline upload | MII | Disqualified |
Dismantling, shifting, re-erection, foundation, electrical cable shifting/extension, earthing, testing and commissioning of street light pole.
Dismantling, shifting, re-erection, foundation, electrical cable shifting/extension, earthing, testing and commissioning of street light pole.
Read moreSupplying, erection, testing, commissioning of high mast pole, foundation, earthing, decorative pole foundation and earthing at proposed odha ghat on godavari river, dist. nashik for sinhast kumbhmela year 2027
Supplying, erection, testing, commissioning of high mast pole, foundation, earthing, decorative pole foundation and earthing at proposed odha ghat on godavari river, dist. nashik for sinhast kumbhmela year 2027
Read moreSupplying, erection, testing, commissioning of high mast pole, foundation, earthing, decorative pole foundation and earthing at proposed dasak ghat on godavari river, dist. nashik for sinhast kumbhmela year 2027
Supplying, erection, testing, commissioning of high mast pole, foundation, earthing, decorative pole foundation and earthing at proposed dasak ghat on godavari river, dist. nashik for sinhast kumbhmela year 2027
Read moreSupplying, erection, testing, commissioning of high mast pole, foundation, earthing, decorative pole foundation and earthing at proposed kapila sangam ghat on godavari river, dist. nashik for sinhast kumbhmela year 2027
Supplying, erection, testing, commissioning of high mast pole, foundation, earthing, decorative pole foundation and earthing at proposed kapila sangam ghat on godavari river, dist. nashik for sinhast kumbhmela year 2027
Read moreSupplying, erection, testing, commissioning of high mast pole, foundation, earthing, decorative pole foundation and earthing at proposed nandini lb downstream ghat on godavari river, dist. nashik for sinhast kumbhmela year 2027
Supplying, erection, testing, commissioning of high mast pole, foundation, earthing, decorative pole foundation and earthing at proposed nandini lb downstream ghat on godavari river, dist. nashik for sinhast kumbhmela year 2027
Read moreErection and dismantling of oh line and other associated jobs such as dismantling and erection of pole, oh conductors, light fittings etc. to illuminate durga puja pandal and colony critical points at balram township under balram ocp, hingula area
Erection and dismantling of oh line and other associated jobs such as dismantling and erection of pole, oh conductors, light fittings etc. to illuminate durga puja pandal and colony critical points at balram township under balram ocp, hingula area
Read moreProviding lightning arrestor, earthing ,cradle guard and erection of poles, etc and dismantling of poles, conductor,etc near mahalaxmi camp sub station and its 3.3kv ht line under ashok west ocp, piparwar area.
Providing lightning arrestor, earthing ,cradle guard and erection of poles, etc and dismantling of poles, conductor,etc near mahalaxmi camp sub station and its 3.3kv ht line under ashok west ocp, piparwar area.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreHeavy duty screw,screw driver,screw driver,screw driver thin stem,knife double,screw driver thin stem,multimeter digital,wireless router,screw driver,screw driver,screw driver,screw driver,knife double bladed,plier flat,earth leakage circuit breaker,series type ohm meter,shunt type ohm meter,screw driver insulated,tong tester,phase sequence indicator,stepper motor with digital,shaded pole motor fractional,variable auto transformer,motor ac single phase,watt meter digital,star delta strater soft starter,transformer single phase,external hard disk,external hard disk,screw driver,terminal screw driver,knife electrician,set of rowel punch,crimping tool,electric kettle,mixture-mixer grinder,electric iron,screw driver,rheostat,resistance box,resistance coils,ammeter,voltmeter,battery eliminator,knife folded stainless,tong tester
Heavy duty screw,screw driver,screw driver,screw driver thin stem,knife double,screw driver thin stem,multimeter digital,wireless router,screw driver,screw driver,screw driver,screw driver,knife double bladed,plier flat,earth leakage circuit breaker,series type ohm meter,shunt type ohm meter,screw driver insulated,tong tester,phase sequence indicator,stepper motor with digital,shaded pole motor fractional,variable auto transformer,motor ac single phase,watt meter digital,star delta strater soft starter,transformer single phase,external hard disk,external hard disk,screw driver,terminal screw driver,knife electrician,set of rowel punch,crimping tool,electric kettle,mixture-mixer grinder,electric iron,screw driver,rheostat,resistance box,resistance coils,ammeter,voltmeter,battery eliminator,knife folded stainless,tong tester
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type