Tender Details

Particulars Details
Title
Laying Of 125 Meter Interlocking And Const. Of 7.30 Meter Drain From Santosh House To Vishambhar House In Village Monglapur, Block Pahla
Description
Laying Of 125 Meter Interlocking And Const. Of 7.30 Meter Drain From Santosh House To Vishambhar House In Village Monglapur, Block Pahla
Organisation Director Cum Chief Engineer RED | State Govt. and UT
Tender Id 2023_REDUP_875613_37
Reference
Number
Tender Fee 813
EMD 25700
Tender Value
Place Pahla, Sitapur
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1493298
Start Date December 30, 2023 20:30
End Date

08/01/2024 ( Expired 518 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)

Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)

Read more
Widening and strengthening of nh 148b from km. 226.370 to km. 234.900 i.e. from tohana haryana border to moonak jakhal excluding stretch from km. 233.830 to km. 234.300 on epc mode in state of punjab

Widening and strengthening of nh 148b from km. 226.370 to km. 234.900 i.e. from tohana haryana border to moonak jakhal excluding stretch from km. 233.830 to km. 234.300 on epc mode in state of punjab

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise