Tender Details

Particulars Details
Title
Needle Indicator Assembly To Ptj Drg.No.Wm/93/83 Comprising Of 14 Part Drawings Mentioned In The Assembly Drawing.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106272584
Reference
Number
56241258
Tender Fee 0
EMD 0
Tender Value
Place Secunderabad
Link https://www.ireps.gov.in/ireps/supply/pdfdocs/042024/106272584/viewNitPdf_4487018.pdf
Start Date February 19, 2024 23:03
End Date

01/04/2024 ( Expired 454 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Independent engineering services during operation and maintenance of (i) oddanchatram to madathukulam section of nh-83 and (ii) oddanchatram bypass of nh-83 in the state of tamil nadu (3rd call)

Independent engineering services during operation and maintenance of (i) oddanchatram to madathukulam section of nh-83 and (ii) oddanchatram bypass of nh-83 in the state of tamil nadu (3rd call)

Read more
Impvt wks incl investigation design and drawing proof check by iit fm km 125 pt 05 to 125 pt 250 and km 131 pt 950 to km 132 pt 110 along s k t t rd under 94 rcc 38 brtf rd sector of project deepak in hp state

Impvt wks incl investigation design and drawing proof check by iit fm km 125 pt 05 to 125 pt 250 and km 131 pt 950 to km 132 pt 110 along s k t t rd under 94 rcc 38 brtf rd sector of project deepak in hp state

Read more
Up keeping and maintenance of area around 12 th to 14 cross roads in oft estate

Up keeping and maintenance of area around 12 th to 14 cross roads in oft estate

Read more
Operation and maintenance and incident management of six lane phagwara-jalandhar section of nh-44 from km.352.730 to km. 387.100 part of panipat-jalandhar section in the state of punjab on item rate basis

Operation and maintenance and incident management of six lane phagwara-jalandhar section of nh-44 from km.352.730 to km. 387.100 part of panipat-jalandhar section in the state of punjab on item rate basis

Read more
Special repair annual maintenance of e.i works in the 93 t i to t iv govt residential quarter at kts kumaritilla malanchaniwas housing board quarters complex at 79 tilla including old mla hostel no1 for the year 2025_2026 i.e sub div noi agartala

Special repair annual maintenance of e.i works in the 93 t i to t iv govt residential quarter at kts kumaritilla malanchaniwas housing board quarters complex at 79 tilla including old mla hostel no1 for the year 2025_2026 i.e sub div noi agartala

Read more
Special repair to lt switch gear panels, lt switch gears, connected accessories in vijay bhavan, provn of additional exhust fans for bldg no p-91, 90, 87, 79, 86, 78, 83, arjun block and spl repair of ber dg set of 10 kva one no under ge(w) colaba

Special repair to lt switch gear panels, lt switch gears, connected accessories in vijay bhavan, provn of additional exhust fans for bldg no p-91, 90, 87, 79, 86, 78, 83, arjun block and spl repair of ber dg set of 10 kva one no under ge(w) colaba

Read more
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Read more
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Read more
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Read more
Construction of 14 nos. of sectionalisation stoppings to sectionalise rise side above shaft level of pit no. 2 upto the mine boundary in r-v (satgram) seam, j. k. nagar

Construction of 14 nos. of sectionalisation stoppings to sectionalise rise side above shaft level of pit no. 2 upto the mine boundary in r-v (satgram) seam, j. k. nagar&#x0d colliery&#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise