Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Soil Excavation For Soft Soil,Soil Excavation For Morrum Soil,Extra For Providing Masonery Enclosur
|
| Description |
|
| Organisation | NA | Ministry of Culture |
| Tender Id | GEM/2025/B/5829230 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 16, 2025 22:39 |
| End Date |
Expired
06/02/2025
Expired 620 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreWork regarding soil excavation, barricading, and the installation of view cutters for the chhath puja festival at magazine ghat, falling in suterganj under ward-75 zone-04.
Work regarding soil excavation, barricading, and the installation of view cutters for the chhath puja festival at magazine ghat, falling in suterganj under ward-75 zone-04.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read more5 mp ip bullet camera,5 mp ip dome camera,16 channel nvr with 4 hdd support,28 port full giga managed poe switch,2 tb survellance hard disk,poe 4 port giga switch,supply laying and terminal connectorrisation of cat 06 outdoor cable,pvc conduit 25 mm medium with accessories,rj 45 connectors,pvc junctions box for bullet cameras,hdmi cable 3m,power extension board,laying of ms conduit hdpe pipe on soft soil hard surface road cutting and making it proper as per site requirements,installation of cameras junction box poe switch stw of camera and nvrs
5 mp ip bullet camera,5 mp ip dome camera,16 channel nvr with 4 hdd support,28 port full giga managed poe switch,2 tb survellance hard disk,poe 4 port giga switch,supply laying and terminal connectorrisation of cat 06 outdoor cable,pvc conduit 25 mm medium with accessories,rj 45 connectors,pvc junctions box for bullet cameras,hdmi cable 3m,power extension board,laying of ms conduit hdpe pipe on soft soil hard surface road cutting and making it proper as per site requirements,installation of cameras junction box poe switch stw of camera and nvrs
Read moreDismantling of 5 hp motor gear box and fabricated cantrol,material and labour for making,material and labour for disconnecting and removing,supply only bearings suitable for 5 hp,material and labour for servicing of gear box,supply and fixing in replacement of power ac contractor,supply and fixing in replacement of variable,supply and fixing in replacement of heavy duty,supply and fixing in replacement chain,material and labour for maintenance servicing,supply and fixing in replacement three phase,supply laying testing and commissioning,supply and laying of dwc pipe isi marked,supply and fixing 10 mm dia steel string,material and labour pcc,excavation in trenches not exc,returning filling in including spreading,removing excavated soil
Dismantling of 5 hp motor gear box and fabricated cantrol,material and labour for making,material and labour for disconnecting and removing,supply only bearings suitable for 5 hp,material and labour for servicing of gear box,supply and fixing in replacement of power ac contractor,supply and fixing in replacement of variable,supply and fixing in replacement of heavy duty,supply and fixing in replacement chain,material and labour for maintenance servicing,supply and fixing in replacement three phase,supply laying testing and commissioning,supply and laying of dwc pipe isi marked,supply and fixing 10 mm dia steel string,material and labour pcc,excavation in trenches not exc,returning filling in including spreading,removing excavated soil
Read more4mp ip outdoor heavy duty bullet camera,4mp ip indoor dome camera,64 channel enterprise network video recorder nvr,4 2 port fast gigabit poe switch,8 2 port industrial gigabit poe switch,cat 6 utp high speed copper lan cable,25mm heavy duty rigid electrical conduit pipe,ip66 pvc field junction box rack,single mode core optical fibre cable ofc,4tb surveillance enterprise grade hard drives,camera all weather protective housings,galvanised iron gi mounting poles,factory molded patch cords,outdoor enclosures,high density protective pvc pipe 25mm,6u wall mount network equipment rack,industrial gigabit sfp media converters,1 25 gb gigabit sfp optical transceiver modules,optical to hdmi converter over single mode fiber,24 port gigabit l2 managed network switch,16 port gigabit unmanaged smart switch,outdoor industrial metal field enclosures,surge and lightning air terminal spikes,electrical power cable,55 commercial grade 4k surveillance monitor,hard soil excavation and underground trenching,civil masonry and structu
4mp ip outdoor heavy duty bullet camera,4mp ip indoor dome camera,64 channel enterprise network video recorder nvr,4 2 port fast gigabit poe switch,8 2 port industrial gigabit poe switch,cat 6 utp high speed copper lan cable,25mm heavy duty rigid electrical conduit pipe,ip66 pvc field junction box rack,single mode core optical fibre cable ofc,4tb surveillance enterprise grade hard drives,camera all weather protective housings,galvanised iron gi mounting poles,factory molded patch cords,outdoor enclosures,high density protective pvc pipe 25mm,6u wall mount network equipment rack,industrial gigabit sfp media converters,1 25 gb gigabit sfp optical transceiver modules,optical to hdmi converter over single mode fiber,24 port gigabit l2 managed network switch,16 port gigabit unmanaged smart switch,outdoor industrial metal field enclosures,surge and lightning air terminal spikes,electrical power cable,55 commercial grade 4k surveillance monitor,hard soil excavation and underground trenching,civil masonry and structu
Read moreSurface excavation for cleaning of site not exceeding 30 cm and avg 15cm deep and getting mud out,sand filling under floors or in foundations including watering and consolidation,cement concrete in foundations filling and mass concrete for making surface plain and smooth,rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,brickwork with fly ash bricks straight or curved on plan exc 6m mean radius built,boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m 300mm dia,reinforced cement concrete nominal mix in columns pillars piers posts and struts,rendering 12mm thick on fair faces of brick work or concrete surfaces,finishing walls with acrylic smooth exterior paint of required shade,framed work such as grills gratings etc with ends of bars shouldered and or riveted or forged into spikes,surfaces of any deion over 10cm in width or girth not otherwise described,shingle or gravel spread ro
Surface excavation for cleaning of site not exceeding 30 cm and avg 15cm deep and getting mud out,sand filling under floors or in foundations including watering and consolidation,cement concrete in foundations filling and mass concrete for making surface plain and smooth,rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,brickwork with fly ash bricks straight or curved on plan exc 6m mean radius built,boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m 300mm dia,reinforced cement concrete nominal mix in columns pillars piers posts and struts,rendering 12mm thick on fair faces of brick work or concrete surfaces,finishing walls with acrylic smooth exterior paint of required shade,framed work such as grills gratings etc with ends of bars shouldered and or riveted or forged into spikes,surfaces of any deion over 10cm in width or girth not otherwise described,shingle or gravel spread ro
Read moreSurface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc
Surface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc
Read moreof your Industry type