Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Constr Of New Plinth,Excavation Of Soil,Morrum Filling,Repair Of Existing Plinth,Labour Charges
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2023/B/4168909 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | November 03, 2023 21:47 |
| End Date |
Expired
13/11/2023
Expired 1065 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | DN AUTOMATION & SOLUTIONS | - | 12-11-2023 23:05:08 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 2 | KRISHNA ENTERPRISE | - | 12-11-2023 17:10:48 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 3 | Utility Unit Services | - | 13-11-2023 10:43:15 | Registered with designated Agency / Authority | MII MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | KRISHNA ENTERPRISE(MSE,MII) | Item Categories : Constr of New Plinth,Excavation of Soil,Morrum Filling,Repair of Existing Plinth,Labour Charges | 523000.00 | L1 |
| 2 | Utility Unit Services (MSE,MII) | Item Categories : Constr of New Plinth,Excavation of Soil,Morrum Filling,Repair of Existing Plinth,Labour Charges | 592900.00 | L2 |
| 3 | DN AUTOMATION & SOLUTIONS (MSE,MII) | Item Categories : Constr of New Plinth,Excavation of Soil,Morrum Filling,Repair of Existing Plinth,Labour Charges | 598600.00 | L3 |
Earth filling(replacement of existing soil upto 4m) for the archagar and staff quarters
Earth filling (replacement of existing soil upto 4m) for the archagar and staff quarters belong to arulmigu raveeswarar, temple,vyasarpadi, chennai
Read morePlinth protection including drain around the new office and wall and earthwork (soil filling) on the forest route behind the gate in ward no. 14 sohardr nagar.
Plinth protection including drain around the new office and wall and earthwork (soil filling) on the forest route behind the gate in ward no. 14 sohardr nagar.
Read moreProvision of equipment plinth concrete with form work brickwork filling at 110/22kv ss kethaiyurumbu
Provision of equipment plinth concrete with form work brickwork filling at 110/22kv ss kethaiyurumbu
Read moreConstruction of balance central media , soil filling and plantation work below metro line
Construction of balance central media , soil filling and plantation work below metro line
Read moreRepair maintanance work in plinth of existing sheds at anaj mandi yard kums khargone
Repair maintanance work in plinth of existing sheds at anaj mandi yard kums khargone
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreProvision of raising plateform of firing range and soil filling and pol store at armoury at 24 ed
Provision of raising plateform of firing range and soil filling and pol store at armoury at 24 ed
Read moreConstruction of a boundary wall in ward no 08 following the filling of the government garahi with soil
Construction of a boundary wall in ward no 08 following the filling of the government garahi with soil
Read moreEarthwork (soil filling) in the pathway from c.c. road to highway bridge in ward no. 04 shyama prasad mukherjee nagar (faridpur tappa).
Earthwork (soil filling) in the pathway from c.c. road to highway bridge in ward no. 04 shyama prasad mukherjee nagar (faridpur tappa).
Read moreEarthwork (soil filling) on both sides of the drain from mahroofpur road to pyare boundary in ward no. 11 sardar vallabhbhai patel.
Earthwork (soil filling) on both sides of the drain from mahroofpur road to pyare boundary in ward no. 11 sardar vallabhbhai patel.
Read moreof your Industry type