Tender Details

Particulars Details
Title
Construction Of Pure Tula (Sarai Hardo) Link Road. Km 1 To 2(500)
Description
Construction Of Pure Tula (Sarai Hardo) Link Road. Km 1 To 2(500)
Organisation Chief Engineer PWD Central Zone,Lucknow | State Govt. and UT
Tender Id 2024_CEUCZ_946769_1
Reference
Number
4816/401C(1)-L.CIR/24-25, Dt. 06-08-24
Tender Fee 2714
EMD 4.45 Lakh
Tender Value -
Place RAEBARELI
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1641722

Start Date August 16, 2024 23:55
End Date
Expired 29/08/2024

Expired 773 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Expression of interest (eoi) for conversion / retrofitment of existing diesel swachh autos to pure electric vehicles (evs) in nalgonda municipal corporation

Expression of interest (eoi) for conversion / retrofitment of existing diesel swachh autos to pure electric vehicles (evs) in nalgonda municipal corporation

Read more
Supply of various valves for tm division in 500 mw unit

Supply of various valves for tm division in 500 mw unit

Read more
Estimate for mastic asphalt road( bitumen) and both side rcc drain from sarai more to sanjay saree centre , in ward no-26 , under nagar nigam sasaram rohtas district

Estimate for mastic asphalt road( bitumen) and both side rcc drain from sarai more to sanjay saree centre , in ward no-26 , under nagar nigam sasaram rohtas district

Read more
Emergency electrical remediation and urgent repairs (new 500 kva dg set) at rims adilabad in adilabad district

Emergency electrical remediation and urgent repairs (new 500 kva dg set) at rims adilabad in adilabad district

Read more
Supply, installation of 500 lph ro plant with 3 yrs cmc after completion of warranty period at kkocp, mm area.

Supply, installation of 500 lph ro plant with 3 yrs cmc after completion of warranty period at kkocp, mm area.

Read more
Laying of missing link d.i. pipe line from pirmuhani more to jaypur hotel gali in ward no. 36

Laying of missing link d.i. pipe line from pirmuhani more to jaypur hotel gali in ward no. 36

Read more
Dismantling of old chain link fencing and providing compound wall allround kpcl quarters at bhep colony- phase iv

Replacement of damaged chain-link fencing with construction of a compound wall with barbed wire on top along the boundary of bhadra colony for a balance length of 410m.

Read more
A.m to reverted reach of nh-63 road from km 198/900 to 204/500 in mancherial district for the year 2026-27 (4th call)

A.m to reverted reach of nh-63 road from km 198/900 to 204/500 in mancherial district for the year 2026-27 (4th call)

Read more
Spares suitable for everest transmission make air blowers (model: 610 es) of condensate polishing unit service vessels in turbine maintenance division of 500 mw unit

Spares suitable for everest transmission make air blowers (model: 610 es) of condensate polishing unit service vessels in turbine maintenance division of 500 mw unit

Read more
Providing see through wall with pvc coated chain link mesh around amenities building in ip-sultanpur, sangareddy district (reserved for sc only)

Providing see through wall with pvc coated chain link mesh around amenities building in ip-sultanpur, sangareddy district (reserved for sc only)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise