Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Of 210 Meters Of M Pipes 6 Inch From Vertical Delivery Range Of Patch B, Transporting And Laying Of Same At Patch B Of East Basuria Colliery
|
| Description |
Dismantling Of 210 Meters Of M Pipes 6 Inch From Vertical Delivery Range Of Patch B, Transporting And Laying Of Same At Patch B Of East Basuria Colliery
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_323817_1 |
|
Reference Number |
BCCL/AVI/EnM/2024-25/179 |
| Tender Fee | 0 |
| EMD | 2239 |
| Tender Value | - |
| Place | EBC |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335650 |
| Start Date | December 21, 2024 16:30 |
| End Date |
Expired
01/01/2025
Expired 651 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
For dismantling and manual transporting and stocking of ms pipe 10 inch 800 mtrs. and old ms pontoon dismantling and transporting loading and unloading at basdeopur colliery under sijua area
For dismantling and manual transporting and stocking of ms pipe 10 inch 800 mtrs. and old ms pontoon dismantling and transporting loading and unloading at basdeopur colliery under sijua area
Read moreDismantling loading transporting and assembling of udm 611 259 from surface to working kalimati seam at kumardhubi colliery mugma area
Dismantling loading transporting and assembling of udm 611 259 from surface to working kalimati seam at kumardhubi colliery mugma area
Read moreDismantling of old damaged platform with its bracing and two way chute and fabrication of the same at surface bunker of ncph colliery r-6 mine, ncph sub-area
Dismantling of old damaged platform with its bracing and two way chute and fabrication of the same at surface bunker of ncph colliery r-6 mine, ncph sub-area
Read moreMtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil
Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read more(1) dismantling,transporting and jointing of 8in dia m.s pipes with fabrication jobs at akwmc ocp.(2) dismantling,loading and transporting of vertical of east side departmental side pumping station and stringing
(1) 
 dismantling,transporting 
 and jointing of 8in dia m.s 
 pipes with fabrication 
 jobs at akwmc ocp.(2) 
 dismantling,loading and 
 transporting of vertical 
 of east side departmental 
 side pumping station and 
 stringing
Read moreDismantling, carrying, transporting and fitting of sdl/udm at khas kajora colliery
Dismantling, carrying, transporting and fitting of sdl/udm at khas kajora colliery
Read moreDismantling transporting and jointing of 6 inch dia ms pipe line at bastacolla colliery.
Dismantling transporting and jointing of 6 inch dia ms pipe line at bastacolla colliery.
Read moreFor dismantling of 43 nos. of m pipes 6, flange welding in 40 nos. of pipes and laying of same for shifting of pump at patch b of ebc.
For dismantling of 43 nos. of m pipes 6, flange welding in 40 nos. of pipes and laying of same for shifting of pump at patch b of ebc.
Read moreof your Industry type