Tender Details

Particulars Details
Title
Dismantling Of 210 Meters Of M Pipes 6 Inch From Vertical Delivery Range Of Patch B, Transporting And Laying Of Same At Patch B Of East Basuria Colliery
Description
Dismantling Of 210 Meters Of M Pipes 6 Inch From Vertical Delivery Range Of Patch B, Transporting And Laying Of Same At Patch B Of East Basuria Colliery
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2024_BCCL_323817_1
Reference
Number
BCCL/AVI/EnM/2024-25/179
Tender Fee 0
EMD 2239
Tender Value -
Place EBC
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335650

Start Date December 21, 2024 16:30
End Date
Expired 01/01/2025

Expired 651 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
For dismantling and manual transporting and stocking of ms pipe 10 inch 800 mtrs. and old ms pontoon dismantling and transporting loading and unloading at basdeopur colliery under sijua area

For dismantling and manual transporting and stocking of ms pipe 10 inch 800 mtrs. and old ms pontoon dismantling and transporting loading and unloading at basdeopur colliery under sijua area

Read more
Dismantling loading transporting and assembling of udm 611 259 from surface to working kalimati seam at kumardhubi colliery mugma area

Dismantling loading transporting and assembling of udm 611 259 from surface to working kalimati seam at kumardhubi colliery mugma area

Read more
Dismantling of old damaged platform with its bracing and two way chute and fabrication of the same at surface bunker of ncph colliery r-6 mine, ncph sub-area

Dismantling of old damaged platform with its bracing and two way chute and fabrication of the same at surface bunker of ncph colliery r-6 mine, ncph sub-area

Read more
Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil

Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
(1) dismantling,transporting and jointing of 8in dia m.s pipes with fabrication jobs at akwmc ocp.(2) dismantling,loading and transporting of vertical of east side departmental side pumping station and stringing

(1) &#x0d dismantling,transporting &#x0d and jointing of 8in dia m.s &#x0d pipes with fabrication &#x0d jobs at akwmc ocp.(2) &#x0d dismantling,loading and &#x0d transporting of vertical &#x0d of east side departmental &#x0d side pumping station and &#x0d stringing

Read more
Dismantling, carrying, transporting and fitting of sdl/udm at khas kajora colliery

Dismantling, carrying, transporting and fitting of sdl/udm at khas kajora colliery

Read more
Dismantling transporting and jointing of 6 inch dia ms pipe line at bastacolla colliery.

Dismantling transporting and jointing of 6 inch dia ms pipe line at bastacolla colliery.

Read more
For dismantling of 43 nos. of m pipes 6, flange welding in 40 nos. of pipes and laying of same for shifting of pump at patch b of ebc.

For dismantling of 43 nos. of m pipes 6, flange welding in 40 nos. of pipes and laying of same for shifting of pump at patch b of ebc.

Read more