Tender Details
Particulars | Details |
---|---|
Title |
Kmc/Dgc/Xi/111/002/2025 26/R
|
Description |
Restoration Of Rd. By Laying Hot Mix Disturbed By Wbsedcl Due To Laying Of U.G. Cable Duct At New Sonali Park, Kalachand Para And Rabindra Pally In Wd. No. 111
|
Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
Tender Id | 2025_KMC_839411_1 |
Reference Number |
KMC/DGC/XI/111/002/2025-26/R |
Tender Fee | 0 |
EMD | 20000 |
Tender Value | |
Place | WARD NO-111 |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1871637 |
Start Date | April 30, 2025 22:30 |
End Date |
08/05/2025 ( Expired 9 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of fire fighting arrangement with hydrant including construction of pump house and permanent restoration by paver tiles damaged due to laying of underground ms pipe in and around tarakeswar temple compl
Supply, installation, testing and commissioning of fire fighting arrangement with hydrant including construction of pump house and permanent restoration by paver tiles damaged due to laying of underground ms pipe in and around tarakeswar temple compl
Read moreNit_04 of eeudhd 2025_26
Permanent restoration of damagrd hard shoulder flank caused due to pipe laying by phe department along and across karandighi main town existing nh road from 0.541 km to 3.70 km under karandighi zone i piped water supply scheme in the district of ud
Read moreBifurcation of 11 kv falaknuma ug cable feeder
Bifurcation of overloaded 11kv falaknuma ug cable feeder emanating from 33/11kv falaknuma ss by erection of new 11kv feeder from the same ss by laying of 1.6km of 11kv 3x185sq.mm. xlpe ug cable along with bay extension and erection of 11kv vcb at 33/11kv falaknuma sub station in miralam section of miralam sub division of charminar division of hyderabad south circle under t and d improvement to original works under general category
Read moreLaying of 3c x 185 sq mm. xlpe ug cable by microtunneling method with other allied works iro new 11 kv line from mothabari 33/11 kv substation to pataldanga under malda division wbsedcl.
Laying of 3c x 185 sq mm. xlpe ug cable by microtunneling method with other allied works iro new 11 kv line from mothabari 33/11 kv substation to pataldanga under malda division wbsedcl.
Read moreTender for sop to new construction building of rd and pr department by provding 3phase lt cable and metering equipment at bhiuli in (e) section khaliyar uesd,hpsebl,no-iii mandi.(tender no m-iii-13/25-26
Tender for sop to new construction building of rd and pr department by provding 3phase lt cable and metering equipment at bhiuli in (e) section khaliyar uesd,hpsebl,no-iii mandi.(tender no m-iii-13/25-26
Read moreRepair work of broken road due to laying of new sewer line in heera nagar a in ward no. 61
Repair work of broken road due to laying of new sewer line in heera nagar a in ward no. 61
Read moreWbpwd/ee/bkpd/niet-01/2025-26
Restoration work due to cutting of 850m open trench by kmda for laying of under ground 110m dia hdpe main distribution pipe line under amrut 2.0 in naihati from 6.45km to 7.35km of g p rd partly at shoulder and mastic surface under bkpdivn division
Read moreKmc/dgc/xi/111/001/2025-26/r
Restoration of rd. by laying hot mix disturbed by wbsedcl due to laying of u.g. cable duct at anandasree, prantik abasan, sarada park in wd. no.-111
Read moreKmc/dgc/xi/111/002/2025-26/r
Restoration of rd. by laying hot mix disturbed by wbsedcl due to laying of u.g. cable duct at new sonali park, kalachand para and rabindra pally in wd. no.-111
Read moreKmc/dgc/xi/111/003/2025-26/r
Restoration of rd. by laying hot mix disturbed by wbsedcl due to laying of u.g. cable duct at usha pally, charunagar and brahmapur place in wd. no.-111
Read moreof your Industry type