Tender Details

Particulars Details
Title
Side Frame Key.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106417734
Reference
Number
38241221
Tender Fee 0
EMD 1.38 Lakh
Tender Value
Place Allahabad
Link https://www.ireps.gov.in/ireps/supply/pdfdocs/092024/106417734/viewNitPdf_4661332.pdf
Start Date July 30, 2024 17:38
End Date

05/09/2024 ( Expired 253 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)

Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)

Read more
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)

Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)

Read more
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Read more
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)

Read more
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)

Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)

Read more
Provn of key location plan klp for zonal workshop at leh

Provn of key location plan klp for zonal workshop at leh &#x0d ph i of 3 phases under ge i p no 1 leh&#x0d

Read more
Aam kho divider phoolbagh squre to gda divider r.r. tower divider, bejatall road side open places and infront of manas bhavan road side hedge planteation/greenry with 03 month maintenance file no. 25/25x13/1

Aam kho divider phoolbagh squre to gda divider r.r. tower divider, bejatall road side open places and infront of manas bhavan road side hedge planteation/greenry with 03 month maintenance file no. 25/25x13/1

Read more
Construction of rcc drain from ganpat house to dhankubai house both side at ward no 01 lidhorakhas

Construction of rcc drain from ganpat house to dhankubai house both side at ward no 01 lidhorakhas

Read more
Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m

Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m

Read more
Restoration or face-lifting of the front and side of factory building including lifting/ removal of plants and trees from the wall, parapet, roof etc. at old s r mint

Restoration or face-lifting of the front and side of factory building including lifting/ removal of plants and trees from the wall, parapet, roof etc. at old s r mint

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise