Tender Details
Particulars | Details |
---|---|
Title |
Painting Works To The Existing Compound Wall At Gym Building At Sivagamipuram 2nd Cross Street , Thiruvanmiyur In Division 179, Unit 38, Zone 13.
|
Description |
Painting Works To The Existing Compound Wall At Gym Building At Sivagamipuram 2nd Cross Street , Thiruvanmiyur In Division 179, Unit 38, Zone 13.
|
Organisation | Corporation of Chennai | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 4700 |
Tender Value | |
Place | Adyar, Chennai |
Link |
AAAAAAAAAA Login to view |
Start Date | June 11, 2025 23:30 |
End Date |
17/06/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
A/r and m.o to residential builiding under division no-3 at nabha estate shimla (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )
A/r and m.o to residential builiding under division no-3 at nabha estate shimla&#x0d (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )&#x0d
Read moreRepair and replacement of street/ security lights, painting of poles and allied works in zone c and d at mil stn raiwala under age (i) raiwala
Repair and replacement of street/ security lights, painting of poles and allied works in zone c and d at mil stn raiwala under age (i) raiwala
Read moreConstruction of stone masonry wall along the existing footpath from forebay to sidrapong power house, repairing of the footpath and cross drain along with other necessary rectification works at sidrapong hydro electric project
Construction of stone masonry wall along the existing footpath from forebay to sidrapong power house, repairing of the footpath and cross drain along with other necessary rectification works at sidrapong hydro electric project
Read moreImprovement works by providing waterproof coating to existing damaged terrace tile after pointing, replastering and colour washing the back side wall of the division office building thirupathur
Improvement works by providing waterproof coating to existing damaged terrace tile after pointing, replastering and colour washing the back side wall of the division office building thirupathur
Read moreRepair/maint to boundary wall / compound wall, trolley gate, concertinal coil, chain link fencing, barbed wire, razor wire incl certain misc works at certain locations in tech area under ge (af) tech area at af stn agra
Repair/maint to boundary wall / compound wall, trolley gate, concertinal coil, chain link fencing, barbed wire, razor wire incl certain misc works at certain locations in tech area under ge (af) tech area at af stn agra
Read moreRepair to leakage seepage plumbing and misc works in zone iii iva and ivb of various unit at lekhapani under ge dinjan no 2
Repair to leakage seepage plumbing and misc works in zone iii iva and ivb of various unit at lekhapani under ge dinjan no 2
Read moreImprovements to compound wall of anganwadi school at nsc bose nagar in 64th division
Improvements to compound wall of anganwadi school at nsc bose nagar in 64th division
Read morePeakload man power
Engaging of 19 nos. technical assistants (skilled) for each section to assist om staff at the fuse off call office for attending emergency works during peak load hours in operation division zone - i, visakhapatnam for a period of two years i.e from 01.07.2025 to 30.06.2027 (24 months)
Read morePeakload man power
Engaging of 18 nos. technical assistants (skilled) for each section to assist om staff at the fuse off call office for attending emergency works during peak load hours in operation division zone - iii, visakhapatnam for a period of two years i.e from 01.07.2025 to 30.06.2027 (24 months)
Read morePeakload man power
Engaging of 19 nos. technical assistants (skilled) for each section to assist om staff at the fuse off call office for attending emergency works during peak load hours in operation division zone - ii, visakhapatnam for a period of two years i.e from 01.07.2025 to 30.06.2027 (24 months)
Read moreof your Industry type