Tender Details
Particulars | Details |
---|---|
Title |
Renewal Work By Sdbc In Vijaynager Pathalidhar Motor Road From Km 2 To 8 In Augastyamuni Block In District Rudraprayag Under Annual Repair.
|
Description |
Renewal Work By Sdbc In Vijaynager Pathalidhar Motor Road From Km 2 To 8 In Augastyamuni Block In District Rudraprayag Under Annual Repair.
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_pwd_82747_1 |
Reference Number |
497/3AC, Date 08-04-2025 |
Tender Fee | 4720 |
EMD | 2.03 Lakh |
Tender Value | |
Place | Ukhimath |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=98583 |
Start Date | April 22, 2025 16:30 |
End Date |
02/05/2025 ( Expired 9 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConstruction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Read moreImprovements from km167/600 to 187/600 of nh85 (old nh-49e) (kochi -madurai-thondi road) on (epc) basis contract under annual plan 2025-26 in the state of tamilnadu
Improvements from km167/600 to 187/600 of nh85 (old nh-49e) (kochi -madurai-thondi road) on (epc) basis contract under annual plan 2025-26 in the state of tamilnadu
Read moreMahisadal-nandigram road (mdr), from 5.650 km. to 10.650 km. - widening and strengthening works in the district of purba medinipur under tamluk division, pwd
Mahisadal-nandigram road (mdr), from 5.650 km. to 10.650 km. - widening and strengthening works in the district of purba medinipur under tamluk division, pwd, project id-pd252632621s000
Read moreProviding and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreWbpwd/pw(r)/sepd/piu-i/nit-06 of 2025-2026,sl-1
Dhulagarh -jujursah- ekabbarpur road, from 0.00 kmp to 9.00 kmp, widening and strengthening work under howrah highway division in the district of howrah under ridf -xxx.(2nd call)
Read moreConstruction of remaining works of fatgali to dhamoli -malujhal-okhalso motor road from garud-bageshwar motor road in district bageshwar assembly constituency under manifesto of honorable chief minister no 804/2014 (second phase stage 1)
Construction of remaining works of fatgali to dhamoli -malujhal-okhalso motor road from garud-bageshwar motor road in district bageshwar assembly constituency under manifesto of honorable chief minister no 804/2014 (second phase stage 1)
Read moreof your Industry type