Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Expansion Of 4 Lane Patna Ara Buxar As Spur Connectivity From Bharauli (Nh922)to Haidaria (Purvanchal Expressway) Including Const. Of Additional 3 Lane Bridge Over River Ganga At Buxar On Nh922 In Uttar Pradesh And Bihar
|
Description |
Expansion Of 4 Lane Patna Ara Buxar As Spur Connectivity From Bharauli (Nh922)to Haidaria (Purvanchal Expressway) Including Const. Of Additional 3 Lane Bridge Over River Ganga At Buxar On Nh922 In Uttar Pradesh And Bihar
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2023_NHAI_179080_1 |
Reference Number |
|
Tender Fee | 70000 |
EMD | 6.26 Crore |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=196034 |
Start Date | December 23, 2023 14:30 |
End Date |
15/03/2024 ( Expired 477 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreDevelopment of ujjain-jaora access controlled greenfield highway including ujjain spur connectivity as 4-lane with paved shoulder (design length - 98.73 km) in the state of madhya pradesh on hybrid annuity mode.
Development of ujjain-jaora access controlled greenfield highway including ujjain spur connectivity as 4-lane with paved shoulder (design length - 98.73 km) in the state of madhya pradesh on hybrid annuity mode.
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreConsultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Consultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Read moreConstruction of foot over bridge with ramps at km 70800 near jagahedi village of nh709ad in the stretch from shamli to muzaffarnagar pkgii in the state of uttar pradesh
Construction of foot over bridge with ramps at km 70800 near jagahedi village of nh709ad in the stretch from shamli to muzaffarnagar pkgii in the state of uttar pradesh
Read moreRehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreSrmd of repair and rehabilitation cable suspension gandhi bridge over siang river loc at km 2.908 on yingkiong moying rd under 105 rcc sector in aor of 761 brtf under project of brahmank in arunachal pradesh
Srmd of repair and rehabilitation cable suspension gandhi bridge over siang river loc at km 2.908 on yingkiong moying rd under 105 rcc sector in aor of 761 brtf under project of brahmank in arunachal pradesh
Read moreConstruction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh
Construction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh
Read moreConstruction of 150m, 2 lane rcc bridge on chilla pashulok motor road near ganga bhogpur over been river in yamkeshwar constituency of pauri garhwal district as per cm ghosna no. 155/2018 under central road infrastructure fund in state of uttarakhand
Construction of 150m, 2 lane rcc bridge on chilla pashulok motor road near ganga bhogpur over been river in yamkeshwar constituency of pauri garhwal district as per cm ghosna no. 155/2018 under central road infrastructure fund in state of uttarakhand
Read moreof your Industry type