Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Const. Of Additional 3 Lane Bridge Over River Ganga For Connection Between Buxar And Bharauli On Nh922 In Uttar Pradesh And Bihar On Hybrid Annuity Mode 3rd Call
|
Description |
Const. Of Additional 3 Lane Bridge Over River Ganga For Connection Between Buxar And Bharauli On Nh922 In Uttar Pradesh And Bihar On Hybrid Annuity Mode 3rd Call
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_213378_1 |
Reference Number |
NHAI/HQ/BH /Bharauli-Haidaria/ Proc/2023 |
Tender Fee | 50000 |
EMD | 4.45 Crore |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=235236 |
Start Date | November 04, 2024 22:00 |
End Date |
23/12/2024 ( Expired 192 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
4 laning of paramakudi to ramanathapuram sec of nh49 new nh87 from km 80.360 to km 127.025 dc in tamil nadu on hybrid annuity mode (project length-46.665km)
4 laning of paramakudi to ramanathapuram sec of nh49 new nh87 from km 80.360 to km 127.025 dc in tamil nadu on hybrid annuity mode (project length-46.665km)
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreSupply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreDevelopment of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Development of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme
Read moreConsultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode
Read moreDevelopment of rail connectivity for mmlp indore in the state of madhya pradesh on epc mode
Development of rail connectivity for mmlp indore in the state of madhya pradesh on epc mode
Read moreDevelopment of sewage treatment plants and associated infrastructure for pt. deen dayal upadhyay nagar (ddu nagar), state of uttar pradesh on hybrid annuity model basis under namami gange program
Development of sewage treatment plants and associated infrastructure for pt. deen dayal upadhyay nagar (ddu nagar), state of uttar pradesh on hybrid annuity model basis under namami gange program
Read moreof your Industry type