Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wb Hmc/Tn/Ed/Ws/13/23 24
|
| Description |
Withdrawing The Submersible Pump Motor Set Due To Draw Down And Installation The Same After Proper Repairing Of Pump Motor Set And Supply Pvc Column Pipe, 6.0sq. Mm 3 Core Flat Cable And Other Allied Works Etc At Olabibitala Pump House Under Word 25
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_MAD_559809_5 |
|
Reference Number |
WB-HMC/TN/ED/WS/13/23-24 |
| Tender Fee | 0 |
| EMD | 3146 |
| Tender Value | - |
| Place | HMC HEAD OFFICE |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | August 25, 2023 22:30 |
| End Date |
Expired
12/09/2023
Expired 1131 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Read moreWithdrawal 120hp break down submersible pump and re-installation after repairing the same at 01 no. pit at new satgram colliery under satgram sripur area.
Withdrawal 120hp break down submersible pump and re-installation after repairing the same at 01 no. pit at new satgram colliery under satgram sripur area.
Read moreWithdrawal 120hp break down submersible pump and re-installation after repairing the same at 01 no. pit at new satgram colliery under satgram sripur area.
Withdrawal 120hp break down submersible pump and re-installation after repairing the same at 01 no. pit at new satgram colliery under satgram sripur area.
Read moreErection of a decorated welcome gate at harwood point during gangasagar mela 2024 including providing necessary illumination for proper visibility and removing the same after conclusion of mela under kakdwip highway sub-division
Erection of a decorated welcome gate at harwood point during gangasagar mela 2024 including providing necessary illumination for proper visibility and removing the same after conclusion of mela under kakdwip highway sub-division
Read moreAnnual work of hoist maintenance including bringing down from monorail, replacement of damaged bearings and gears, repairing of damaged portion and repositioning of the same at its proper location of hoists of chp, a,btps,obra
Annual work of hoist maintenance including bringing down from monorail, replacement of damaged bearings and gears, repairing of damaged portion and repositioning of the same at its proper location of hoists of chp, a,btps,obra
Read moreDismantling of old motor and motor base structure of its channel, angle, plate etc. of unit no. 651 and 652 changing and fitting after dismantling the same in fine coal section at kathara washery
Dismantling of old motor and motor base structure of its channel, angle, plate etc. of unit no. 651 and 652 changing and fitting after dismantling the same in fine coal section at kathara washery
Read moreFabrication and erection of motor base structure, coupling, reducer and delivery pipe, valve, nipple changing and fitting of unit no. 52 after dismantling the same erection, fabrication of payjama chute of screen 471 after dismantling the old damaged
Fabrication and erection of motor base structure, coupling, reducer and delivery pipe, valve, nipple changing and fitting of unit no. 52 after dismantling the same erection, fabrication of payjama chute of screen 471 after dismantling the old damaged
Read moreWithdrawing and lowering of the two nos. submersible pump motor having capacity (15hp) into the replacement tube well no i and iii and other electro-mechanical allied works for the same and stanby tubewell no i at vivekananda yuva bharati kiranga
Withdrawing and lowering of the two nos. submersible pump motor having capacity (15hp) into the replacement tube well no i and iii and other electro-mechanical allied works for the same and stanby tubewell no i at vivekananda yuva bharati kiranga
Read moreRemoval rubbish, garbage after collection from different places of inside of writers bldgs and mitra building with due cleaning the sites and dumping the same refuses at outside dumping ground during the year 2024-25( for one year).
Removal rubbish, garbage after collection from different places of inside of writers bldgs and mitra building with due cleaning the sites and dumping the same refuses at outside dumping ground during the year 2024-25( for one year).
Read moreShifting of 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with di of its pipe line due to safety purpose at phularitand under amp colliery.
Shifting of 4000gpm pump motor of ground level after and before blasting at jarlahi coal face along with 
 di of its pipe line due to safety purpose at phularitand under amp colliery.
Read moreof your Industry type