Tender Details
Particulars | Details |
---|---|
Title |
Withdrawing And Lowering Of The Two Nos. Submersible Pump Motor Having Capacity (15 Hp) Into The Replacement Tube Well No I And Iii And Other Electro Mechanical Allied Works For The Same And Stanby Tubewell No I At Vivekananda Yuva Bharati Kiranga
|
Description |
Withdrawing And Lowering Of The Two Nos. Submersible Pump Motor Having Capacity (15 Hp) Into The Replacement Tube Well No I And Iii And Other Electro Mechanical Allied Works For The Same And Stanby Tubewell No I At Vivekananda Yuva Bharati Kiranga
|
Organisation | PHE | State Govt. and UT |
Tender Id | 2023_PHED_629715_1 |
Reference Number |
|
Tender Fee | 0 |
EMD | 5000 |
Tender Value | |
Place | Office of the Assistant Engineer, EMSD-I |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1347352 |
Start Date | December 27, 2023 16:30 |
End Date |
10/01/2024 ( Expired 507 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Assistance require for lifting and lowering of 130-200 hp submersible pump and motor and surface pumps with allied works at 40 no. well and johilla pump house under nowrozabad sub area of johilla area. ( for 02 years )
Assistance require for lifting and lowering of 130-200 hp submersible pump and motor and surface pumps with allied works at 40 no. well and johilla pump house under nowrozabad sub area of johilla area. ( for 02 years )
Read moreProviding, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augmentation tube well in connection to accommodate fhtc at pump house no.-i and ii under kishorepur ground water based water
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augmentation tube well in connection to accommodate fhtc at pump house no.-i and ii under kishorepur ground water based water
Read moreSinking of 1 nos tube well and providing electro-mechanical accessories and di rising main connection with existing pipeline for 3 nos tubewell. at tilpara 1 no pump house within suri municipality
Sinking of 1 nos tube well and providing electro-mechanical accessories and di rising main connection with existing pipeline for 3 nos tubewell. at tilpara 1 no pump house within suri municipality
Read moreProviding, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for newly sunk tube well of pump house no. ii under jaulia piped water supply scheme, block- bharatpur-ii and kharsa piped water s
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for newly sunk tube well of pump house no. ii under jaulia piped water supply scheme, block- bharatpur-ii and kharsa piped water s
Read moreProviding, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augumentation in connection to accommodate fhtc at p.h. no.-i, ii, iii iv (new) under dakshin akhratala w/s scheme under bloc
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augumentation in connection to accommodate fhtc at p.h. no.-i, ii, iii iv (new) under dakshin akhratala w/s scheme under bloc
Read moreNit no. 11/2024-25, annual rate contract work of replacement of submersible/ centrifugal mono block pump in old tube well and pipe line at various wss in district bharatpur including defect liability period of two year.
Annual rate contract work of replacement of submersible/ centrifugal mono block pump in old tube well and pipe line at various wss in district bharatpur including defect liability period of two year.
Read moreSitc of d.g set, horizontal multistage pumping unit along with allied works and submersible pumping unit with electro-mechanical works for bore well no 105 under national mission on saffron
Sitc of d.g set, horizontal multistage pumping unit along with allied works and submersible pumping unit with electro-mechanical works for bore well no 105 under national mission on saffron
Read moreLowering lifting and repairing of single phase three phase submersible motor pumps including installation of new single phase pump with accessories over the tube well in different villages in block guna distrct guna including all allied w
Lowering lifting and repairing of single phase three phase submersible motor pumps including installation of new single phase pump with accessories over the tube well in different villages in block guna distrct guna including all allied w
Read moreLowering lifting and repairing of single phase three phase submersible motor pumps including installation of new single phase pump with accessories over the tube well in different villages in block aron distrct guna including all allied w
Lowering lifting and repairing of single phase three phase submersible motor pumps including installation of new single phase pump with accessories over the tube well in different villages in block aron distrct guna including all allied w
Read moreLowering lifting and repairing of single phase three phase submersible motor pumps including installation of new single phase pump with accessories over the tube well in different villages in block bamori distrct guna including all allied
Lowering lifting and repairing of single phase three phase submersible motor pumps including installation of new single phase pump with accessories over the tube well in different villages in block bamori distrct guna including all allied
Read moreof your Industry type