Tender Details

Particulars Details
Title
Execution Of Tfr Work Of Total 192.41 Kms Including Supply Of All P.Way Material Through Epc Mode In Solapur Division.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 75999176
Reference
Number
53-2024-DENC
Tender Fee 0
EMD 11.02 Lakh
Tender Value -
Place Mumbai CST
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/082024/75999176/viewNitPdf_4626097.pdf

Start Date July 15, 2024 22:59
End Date
Expired 26/08/2024

Expired 781 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode

Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.

Read more
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Read more
Construction of total four no. 2-lane class-a loading motor bridges of span 15m, 15m, 15m and 20m on various kms of sh-70, sh-41 and sh-107 in district u.s. nagar under epc mode.

Construction of total four no. 2-lane class-a loading motor bridges of span 15m, 15m, 15m and 20m on various kms of sh-70, sh-41 and sh-107 in district u.s. nagar under epc mode.

Read more
Construction of iwai office building g plus 8 plus 1no service floor total 10 floors at fancy bazar guwahati assam in epc mode

Construction of iwai office building g plus 8 plus 1no service floor total 10 floors at fancy bazar guwahati assam in epc mode

Read more
Construction of total five no. 2-lane class-a loading motor bridges of span 36m, 20m, 25m, 18m and 20m on various kms of khutani bhawali dhanachuli dhunaghat champawat manch tamli motor road (sh-64) in distt. champawat under epc mode.

Construction of total five no. 2-lane class-a loading motor bridges of span 36m, 20m, 25m, 18m and 20m on various kms of khutani bhawali dhanachuli dhunaghat champawat manch tamli motor road (sh-64) in distt. champawat under epc mode.

Read more
Construction of total six no. 2-lane class-a loading motor bridges of span 36m, 42m, 20m, 15m, 18m and 36m on various kms of marchula saraikhet baijro pokhra satpuli pauri motor road (sh 32) in district pauri garhwal under epc mode.

Construction of total six no. 2-lane class-a loading motor bridges of span 36m, 42m, 20m, 15m, 18m and 36m on various kms of marchula saraikhet baijro pokhra satpuli pauri motor road (sh 32) in district pauri garhwal under epc mode.

Read more
Construction of neighbourhood retail centre at amaravati government complex (agc), lingayapalem village, amaravati through epc (design and build) mode (percentage tender) including dlp of 2 years

Construction of neighbourhood retail centre at amaravati government complex (agc), lingayapalem village, amaravati through epc (design and build) mode (percentage tender) including dlp of 2 years

Read more
Execution of ballast less track works from shivalingapuram station km. 45.483 to borraguhalu station km. 72.550 in connection with kottavalasa koraput doubling project of rayagada division, east coast railway on epc mode

Execution of ballast less track works from shivalingapuram station km. 45.483 to borraguhalu station km. 72.550 in connection with kottavalasa koraput doubling project of rayagada division, east coast railway on epc mode

Read more
Through sleeper replacement (tsr) in verna tunnel, km 426/684 to 427/489 (total 1205 metre), including 200 metre approach on both sides of the tunnel, under sse/p.way/mao section phase-i

Through sleeper replacement (tsr) in verna tunnel, km 426/684 to 427/489 (total 1205 metre), including 200 metre approach on both sides of the tunnel, under sse/p.way/mao section phase-i

Read more
Construction of kugging tinali road from km 0.00 to km 36.96 net length 36.96 kms greenfield alignment to nhsl specifications under 1448 bcc 761 brtf in aor of project brahmank in arunachal pradesh on epc mode

Construction of kugging tinali road from km 0.00 to km 36.96 net length 36.96 kms greenfield alignment to nhsl specifications under 1448 bcc 761 brtf in aor of project brahmank in arunachal pradesh on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise