Tender Details

Particulars Details
Title
Construction Of Epi Stopping In 7th Rise Between Tg Of E 8 And Bg Of E 9 Panel In Xvi(b) Seam 500 Mh At Moonidih Colliery W.J Area .
Description
Construction Of Epi Stopping In 7th Rise Between Tg Of E 8 And Bg Of E 9 Panel In Xvi(b) Seam 500 Mh At Moonidih Colliery W.J Area .
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 8528
Tender Value
Place Moonidih Colliery ,WJ Area
Link

AAAAAAAAAA

Login to view
Start Date May 26, 2025 19:30
End Date

05/06/2025 ( 3 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.

Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.

Read more
Construction of side walls and girder support along 35l in between 0xd and 1xd and in between 0xd and minus 1xd in rviia seam at 3 and 4 incline unit jpc

Construction of side walls and girder support along 35l in between 0xd and 1xd and in between 0xd and minus 1xd in rviia seam at 3 and 4 incline unit jpc

Read more
Construction of cc drains with cover slabs from malla sadha shivarao house (d.no-3-6-48a) to devarala vijaya kumar house (d.no-3-9-33/1), gollapudi subbarao house (d.no-3-9-29/5) to mogili ramarao house (d.no-3-6-51/4) and patan subhani house (d.no-3-10-16) to nagineni ratna kumari house (d.no-3-9-18/1) at hari prasad nagar area in ward no-28 in chirala municipality

Construction of cc drains with cover slabs from malla sadha shivarao house (d.no-3-6-48a) to devarala vijaya kumar house (d.no-3-9-33/1), gollapudi subbarao house (d.no-3-9-29/5) to mogili ramarao house (d.no-3-6-51/4) and patan subhani house (d.no-3-10-16) to nagineni ratna kumari house (d.no-3-9-18/1) at hari prasad nagar area in ward no-28 in chirala municipality

Read more
Construction of master plan road in industrial area between sector s 5 and s 9 gida gorakhpur

Construction of master plan road in industrial area between sector s 5 and s 9 gida gorakhpur

Read more
New installation of belt conveyor at b19c panel in rvi seam for shcm in khottadih colliery pandaveswar area

New installation of belt conveyor at b19c panel in rvi seam for shcm in khottadih colliery pandaveswar area

Read more
Construction of permanent support of pit no. 2 bottom travelling route to 6d with brick pillar and girder support in kenda bottom seam of kunustoria colliery under kunustoria area

Construction of permanent support of pit no. 2 bottom travelling route to 6d with brick pillar and girder support in kenda bottom seam of kunustoria colliery under kunustoria area

Read more
Construction of 5 (five) nos 0.50m thick isolation stopping at rvii seam no 8 pit of bankola colliery.

Construction of 5 (five) nos 0.50m thick isolation stopping at rvii seam no 8 &#x0d pit of bankola colliery.&#x0d

Read more
Transportation of different items and daily maintenance of of belt conveyor (45days)of xvi(b)seam at moonidih colliery, w.j. area

Transportation of different items and daily maintenance of of belt conveyor (45days)of xvi(b)seam at moonidih colliery, w.j. area&#x0d

Read more
Construction of shed between kitchen to dining area in malviya, tilak, patel and tandon hostel at hostel campus

Construction of shed between kitchen to dining area in malviya, tilak, patel and tandon hostel at hostel campus

Read more
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.

Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise