Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Erection Of 19.95 Km 33 Kv Line In Peddapally Division
|
| Description |
Erection Of 19.95 Km 33 Kv Lines In Peddapally (Package I) Operation Division Of Peddapally Circle On Partial Turnkey Basis
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 518928 |
|
Reference Number |
I-98/2024-25/TGNPDCL/CGM(PROJ)/PDPL |
| Tender Fee | 3240 |
| EMD | 1.83 Lakh |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | June 14, 2024 01:30 |
| End Date |
Expired
26/06/2024
Expired 833 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreErection of 22.41km 33 kv line in peddapally package ii in peddapally division
Erection of 22.41km 33kv lines in peddapally (package-ii) operation division of peddapally circle under td/si on partial turnkey basis.
Read moreErection of11.42km 33kv line in bhainsa division
Erection of 11.42km 33kv lines in bhainsa operation division of nirmal circle on partial turnkey basis
Read moreErection of16.70km 33kv line in kothagudem division
Erection of 16.70km 33kv lines from challasamudram to manikyaram in kothagudem operation division of kothagudem circle on partial turnkey basis.
Read moreErection of 23.80km 33kv line in nirmal division
Erection of 23.80km 33kv lines in nirmal operation division of nirmal circle under td/si on partial turnkey.
Read moreErection of 25.90km 33kv line in jagitial division
Erection of 25.90km 33kv lines in jagitial operation division of jagitial circle under td/si on partial turnkey basis.
Read moreErection of 30.00km 33kv line in metpally division
Erection of 30.00km 33kv lines in metpally operation division of jagitial circle under td/si on partial turnkey.
Read moreErection of 26.00km 33kv line in manthini division
Erection of 26.00km 33kv lines in manthani operation division of peddapally circle under td/si on partial turnkey.
Read moreof your Industry type