Tender Details

Particulars Details
Title
Speedometer Assy For Stln,Rear Brake Shoe For Re,Front Brake Shoe For Re,Front Brake Cable For Re,C
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2023/B/4120598
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date October 21, 2023 17:31
End Date
Expired 31/10/2023

Expired 1077 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 DURGA MOTOR & TRADING CO - 24-10-2023 10:37:08 MSE Qualified
2 S.N.DISTRIBUTORS - 24-10-2023 10:45:09 MSE Qualified
3 SHYAM SUNDAR RAVI PRAKASH - 24-10-2023 10:54:27 MSE Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 DURGA MOTOR & TRADING CO( MSE Social Category:General ) Item Categories : SPEEDOMETER ASSY FOR STLN,REAR BRAKE SHOE FOR RE,FRONT BRAKE SHOE FOR RE,FRONT BRAKE CABLE FOR RE,C 40662.00 L1
2 S.N.DISTRIBUTORS( MSE Social Category:General ) Item Categories : SPEEDOMETER ASSY FOR STLN,REAR BRAKE SHOE FOR RE,FRONT BRAKE SHOE FOR RE,FRONT BRAKE CABLE FOR RE,C 41030.00 L2
3 Shyamsunder Raviprakash( MSE Social Category:General ) Item Categories : SPEEDOMETER ASSY FOR STLN,REAR BRAKE SHOE FOR RE,FRONT BRAKE SHOE FOR RE,FRONT BRAKE CABLE FOR RE,C 41500.00 L3
Similar Tenders
Hiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 and 6), bhupalpalli area for a period of two years with 6000 working hours - reg.

Hiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 and 6), bhupalpalli area for a period of two years with 6000 working hours - reg.

Read more
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.

Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.

Read more
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works

Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise