Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Annual Maintenance Contract For Air Conditioning Units In Pwd Rest House Harippad For A Period Of One Year
|
Description |
Annual Maintenance Contract For Air Conditioning Units In Pwd Rest House Harippad For A Period Of One Year
|
Organisation | Government of Kerala |
Tender Id | 2023_PWD_600811_2 |
Reference Number |
PWD/BLDG/TR/15615 |
Tender Fee | 335 |
EMD | 1242 |
Tender Value | |
Place | Electrical Sub Division, Alappuzha |
Link | https://etenders.kerala.gov.in |
Start Date | September 30, 2023 15:30 |
End Date |
11/10/2023 ( Expired 618 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Routine, breakdown and prive mtc. and overhauling jobs of various mechanical auxiliaries comprising of dm plant, fire fighting system, vertical and horizontal pumps, air compressors, hydrogen gas cylinders loading/unloading, etc
., connected lp piping and valves, operation and maintenance of mechanical workshop and plant drainage pumps of 2x210 mw and 2x250 mw ghtp stage-i and ii, on lump sum basis for a period of one year.
Read moreBiennial contract for coal mill rejection and assistance in misc jobs of operation department including equipment cleaning for all units btps
Biennial contract for coal mill rejection and assistance in misc jobs of operation department including equipment cleaning for all units btps
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreEngaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Engaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Read moreOne time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
Read moreThree-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Read morePurchase of whole wheat atta, refind oil, mustard oil, rice parmal, rice sharbati long grain and rice basmati through rate contract for the period of one year.
Purchase of whole wheat atta, refind oil, mustard oil, rice parmal, rice sharbati long grain and rice basmati through rate contract for the period of one year.
Read morePurchase of paneer through rate contract for the period of one year.
Purchase of paneer through rate contract for the period of one year.
Read morePurchase of double toned milk through rate contract for the period of one year.
Purchase of double toned milk through rate contract for the period of one year.
Read moreProcurement of 190t dumpers along with consumable spares and consumables for warranty period of one year and spares and consumables for post warranty period of 11 years for 190t dumpers under spares cost cap.
Procurement of 190t dumpers along with consumable spares and consumables for warranty period of one year and spares and consumables for post warranty period of 11 years for 190t dumpers under spares cost cap.
Read moreof your Industry type