Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement Of Road From Nalchar To Killamura (L 024) (L 1.125 Km )Under Nalchar Rd Block During Fy 2025 26/Sh Patch Wbm 2 Patch Wbm 3 Carpeting With Sand Seal Coat Pucca Drain And Other Allied Works
|
| Description |
Improvement Of Road From Nalchar To Killamura (L 024) (L 1.125 Km )Under Nalchar Rd Block During Fy 2025 26/Sh Patch Wbm 2 Patch Wbm 3 Carpeting With Sand Seal Coat Pucca Drain And Other Allied Works
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2025_CEPWD_67492_1 |
|
Reference Number |
47/RDNIeT/SE-IV/PWD (RandB) /2025-26 |
| Tender Fee | 1000 |
| EMD | 94956 |
| Tender Value | - |
| Place | Sonamura |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=68676 |
| Start Date | November 21, 2025 23:30 |
| End Date |
Expired
28/11/2025
Expired 319 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.
Development of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.
Read moreDevelopment of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.
Development of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.
Read moreDevelopment of road from khamarbari to jirkanta (l4.95km) under killa block./s.h wbm in patches, grouting, re-carpeting, seal coat and allied works etc.
Development of road from khamarbari to jirkanta (l4.95km) under killa block./s.h wbm in patches, grouting, re-carpeting, seal coat and allied works etc.
Read moreDevelopment of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Read moreRoad development of road from ka road to bowliabasti (l-4.35 km) / sh- metalling, carpeting, pucca drain, etc. ch. 0.00 km to 1.00 km.
Road development of road from ka road to bowliabasti (l-4.35 km) / sh- metalling, carpeting, pucca drain, etc. ch. 0.00 km to 1.00 km.
Read moreDevelopment of the pwd road from dhalabil to rc ghat l- 6.30 km under pwd randb khowai sub-division during the year 2026 27 s.h soling wbm carpeting.
Development of the pwd road from dhalabil to rc ghat l- 6.30 km under pwd randb khowai sub-division during the year 2026 27 s.h soling wbm carpeting.
Read moreDevelopment of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling recarpeting, seal coat, surface drain, pucca drain, toe wall, etc. gr ii from ch. 2.50 km t
Development of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling recarpeting, seal coat, surface drain, pucca drain, toe wall, etc. gr ii from ch. 2.50 km t
Read moreDevelopment of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.
Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.
Read moreDevelopment of road from nh 08 to nh 08 via east raitwisa h s school in c allied road at betcherra t length 700 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch gsb patch wbm and carpeting etc
Development of road from nh 08 to nh 08 via east raitwisa h s school in c allied road at betcherra t length 700 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch gsb patch wbm and carpeting etc
Read moreDevelopment of road from sonamura-boxagnagar road to jumertila (l-0.250 km) sh pucca drain wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.130 km
Development of road from sonamura-boxagnagar road to jumertila (l-0.250 km) sh pucca drain wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.130 km
Read moreof your Industry type