Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Road Development Of Road From Ka Road To Bowliabasti (L 4.35 Km) / Sh Metalling, Carpeting, Pucca Drain, Etc. Ch. 0.00 Km To 1.00 Km.
|
| Description |
Road Development Of Road From Ka Road To Bowliabasti (L 4.35 Km) / Sh Metalling, Carpeting, Pucca Drain, Etc. Ch. 0.00 Km To 1.00 Km.
|
| Organisation | Chief Engineer, PWD (R and B) | SE, PWD (R and B), Fifth Circle | EE PWD (R and B) Ambassa Division |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 1000 |
| EMD | 76977 |
| Tender Value | 38.49 Lakh |
| Place | Tripura |
| Link | Login to view |
| Start Date | October 09, 2026 23:00 |
| End Date |
Closing soon
15/10/2026
2 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Road development of road from nh-8 to vivekanandanagar / sh- metalling, carpeting, rcc cover drain, etc. from ch. 0.00 km to 1.45 km.
Road development of road from nh-8 to vivekanandanagar / sh- metalling, carpeting, rcc cover drain, etc. from ch. 0.00 km to 1.45 km.
Read moreDevelopment of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.
Development of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.
Read moreRoad development of road from nh-8 to vivekanandanagar / sh- metalling, carpeting, rcc cover drain, etc. from ch. 1.55 km to 3.00 km.
Road development of road from nh-8 to vivekanandanagar / sh- metalling, carpeting, rcc cover drain, etc. from ch. 1.55 km to 3.00 km.
Read moreDevelopment of road from sonamura-boxagnagar road to jumertila (l-0.250 km) sh pucca drain wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.130 km
Development of road from sonamura-boxagnagar road to jumertila (l-0.250 km) sh pucca drain wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.130 km
Read moreDevelopment of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.
Development of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.
Read moreDevelopment of road from sonamura-boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.166 km
Development of road from sonamura-boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.166 km
Read moreDevelopment of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Read moreRoad development work of road from ka road to lalchari bridge approach road ( length- 0.50 km) and approach of kulai dashamighat /sh- metalling, carpeting, wearing coat of rcc bridge etc.
Road development work of road from ka road to lalchari bridge approach road ( length- 0.50 km) and approach of kulai dashamighat /sh- metalling, carpeting, wearing coat of rcc bridge etc.
Read moreDevelopment of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling recarpeting, seal coat, surface drain, pucca drain, toe wall, etc. gr ii from ch. 2.50 km t
Development of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling recarpeting, seal coat, surface drain, pucca drain, toe wall, etc. gr ii from ch. 2.50 km t
Read moreDevelopment of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.
Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.
Read moreof your Industry type