Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kmc/Ltg/Z Iv/108/25 26
|
| Description |
Miscellaneous Works Including Pole Covering With Upvc Pipe As A Precaution To Prevent Any Eventuality At Different Poles In Ward No 102, Br Xii.
|
| Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
| Tender Id | 2025_KMC_858647_1 |
|
Reference Number |
KMC/LTG/Z-IV/108/25-26 |
| Tender Fee | 0 |
| EMD | 6000 |
| Tender Value | - |
| Place | WARD-102 |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1925402 |
| Start Date | June 05, 2025 22:30 |
| End Date |
Expired
16/06/2025
Expired 487 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Battery box assembly schedule of infrastructural requirements for stainless steel battery box complete as per specfication no: mdst 141 rev.01 , as per drawing: cc91205 alt a , packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier.
Battery box assembly schedule of infrastructural requirements for stainless steel battery box complete as per specfication no: mdst 141 rev.01 , as per drawing: cc91205 alt a , packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier.
Read moreTrough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Trough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Read moreSet of bracket & plate for lhb power car [set of bracket & plate for lhb power car coach, as per drawing: mp13ufpcar version 3, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier.]
For complete deion and other details, please refer to tender
Read moreBracket for fdb for lhb/ gs amrit bhara [bracket for fdb for lhb/ gs amrit bharat coaches, as per drawing: lg14487 alt nil , packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier.]
For complete deion and other details, please refer to tender
Read moreof your Industry type