Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Trough Floor Assembly Complete For 3 Phase Memu/Dmc Coach
Note:
1.0 Extra Channels Are To Be Provided On Suitable Location Of Trough Floor Assembly For Lifting/Transporation Purpose ., As Per Drawing: Em11545 Alt B Item No. 6 To Be Supplied As Loose In Seprate Packing, Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Damage If Any Sh
|
| Description |
Trough Floor Assembly Complete For 3 Phase Memu/Dmc Coach
Note:
1.0 Extra Channels Are To Be Provided On Suitable Location Of Trough Floor Assembly For Lifting/Transporation Purpose ., As Per Drawing: Em11545 Alt B Item No. 6 To Be Supplied As Loose In Seprate Packing, Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Damage If Any Sh
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | September 25, 2026 21:13 |
| End Date |
Open
26/10/2026
11 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Battery box assembly schedule of infrastructural requirements for stainless steel battery box complete as per specfication no: mdst 141 rev.01 , as per drawing: cc91205 alt a , packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier.
Battery box assembly schedule of infrastructural requirements for stainless steel battery box complete as per specfication no: mdst 141 rev.01 , as per drawing: cc91205 alt a , packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier.
Read moreFloor end profile,l=2000mm, as per drawing: lw41112, packing instruction: as per standard packing. it should be ensured that item should not rub during transportation.the item should be packed with adequate strength.
Floor end profile,l=2000mm, as per drawing: lw41112, packing instruction: as per standard packing. it should be ensured that item should not rub during transportation.the item should be packed with adequate strength.
Read moreDoor grease, isoflex lds 18 special a packing size -1 kg make: kluber,grease for flexible coupling /rs10 grease for flexible coupling /rs10 grease name: kluberlub be 41-,staburags nbu 30 ptm lubricating and assembly grease article no. 0170690028 make: kluber packing si,door grease, isoflex topas nb52 make- kluber packing size-1 kg
Door grease, isoflex lds 18 special a packing size -1 kg make: kluber,grease for flexible coupling /rs10 grease for flexible coupling /rs10 grease name: kluberlub be 41-,staburags nbu 30 ptm lubricating and assembly grease article no. 0170690028 make: kluber packing si,door grease, isoflex topas nb52 make- kluber packing size-1 kg
Read moreOne coach set of air spring assembly (160 kn capacity) for main line/rajdhani lhb coaches for fiat type bogies as per rdso specification no. rdso/cg/s/23002, rev-1. scope of supply shall be as per specification rdso/cg/s/23002, rev-1 (each coach set will consists of four air spring assembly). packing instruction - mcf spi-042. (as) rdso item id: 3100341
One coach set of air spring assembly (160 kn capacity) for main line/rajdhani lhb coaches for fiat type bogies as per rdso specification no. rdso/cg/s/23002, rev-1. scope of supply shall be as per specification rdso/cg/s/23002, rev-1 (each coach set will consists of four air spring assembly). packing instruction - mcf spi-042. (as) rdso item id: 3100341
Read moreTrough floor assembly complete for 3 phase memu/dmc coach
For complete deion and other details, please refer to tender
Read moreTrough floor assembly complete for 3 phase memu/dmc coach
For complete deion and other details, please refer to tender
Read moreSet of bracket & plate for lhb power car [set of bracket & plate for lhb power car coach, as per drawing: mp13ufpcar version 3, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier.]
For complete deion and other details, please refer to tender
Read moreBracket for fdb for lhb/ gs amrit bhara [bracket for fdb for lhb/ gs amrit bharat coaches, as per drawing: lg14487 alt nil , packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier.]
For complete deion and other details, please refer to tender
Read moreOperating shaft assembly (double link) for bobrn wagon (material will be supplied in loose condition)
For complete deion and other details, please refer to tender
Read moreP/f red sand stone slabs is protruding outward and appears to be loose on the wall and outer miscellaneous works of dr. zakir husain library new building, jamia millia islamia
P/f red sand stone slabs is protruding outward and appears to be loose on the wall and outer miscellaneous works of dr. zakir husain library new building, jamia millia islamia
Read moreof your Industry type