Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of High Level Bridge Across Kawaliya Ghat In Km. 1/8 On Itawadi Mirzapur Road. Distt Khargone (Mp)
|
| Description |
Construction Of High Level Bridge Across Kawaliya Ghat In Km. 1/8 On Itawadi Mirzapur Road. Distt Khargone (Mp)
|
| Organisation | PWD- Roads and Bridges | State Govt. and UT |
| Tender Id | 2024_PWDRB_340096_1 |
|
Reference Number |
21/2023-24/Tender |
| Tender Fee | 14034 |
| EMD | 1.33 Lakh |
| Tender Value | |
| Place | Kawaliya Ghat Itawadi Mirzapur Road |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=399149 |
| Start Date | March 02, 2024 16:00 |
| End Date |
Expired
18/03/2024
Expired 833 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreConstruction of bridge over river bansi at pipra gola ghat in district kushinagar
Construction of bridge over river bansi at pipra gola ghat in district kushinagar
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreConstruction of vishramgreh area at nro at raipur - vizag expy 74 km rhs on raipur - visakhapatnam expressway, site 1 - 74 km on rhs from origin abhan
Construction of vishramgreh area at nro at raipur - vizag expy 74 km rhs on raipur - visakhapatnam expressway, site 1 - 74 km on rhs from origin abhanpur (wsa site), district-dhamtari, raipur territory.
Read moreConstruction of vishramgreh area at nro at raipur - vizag expy 74 km lhs on raipur - visakhapatnam expressway, site 1 - 74 km on lhs from origin abha
Construction of vishramgreh area at nro at raipur - vizag expy 74 km lhs on raipur - visakhapatnam expressway, site 1 - 74 km on lhs from origin abhanpur (wsa site), district-dhamtari, raipur territory
Read more1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Read moreC/o ors accommodation, stable and training shed at camp of 48 bn itbp at an altitude of 12600 feet and a distance of approx. 18 km from chungthang, distt-mangan, north sikkim connected with road and further approx. 9 km on foot from nearest roadhead
C/o ors accommodation, stable and training shed at camp of 48 bn itbp at an altitude of 12600 feet and a distance of approx. 18 km from chungthang, distt-mangan, north sikkim connected with road and further approx. 9 km on foot from nearest roadhead
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreof your Industry type