Tender Details

Particulars Details
Title
Recoupment Of Flood Embankment On Both Bank Of River Kollong At Different Reaches Including Protection Measures And Construction Of T/Dyke On L/B From Ch. 6025m To Ch. 7375m.
Description
Recoupment Of Flood Embankment On Both Bank Of River Kollong At Different Reaches Including Protection Measures And Construction Of T/Dyke On L/B From Ch. 6025m To Ch. 7375m.
Organisation Department of Water Resources | State Govt. and UT
Tender Id 2025_DoWR_42458_1
Reference
Number
MORIGAON/2024-25/RIDF-II/I
Tender Fee 7000
EMD 7 Lakh
Tender Value
Place MORIGAON
Link https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=68192
Start Date February 12, 2025 15:30
End Date

21/02/2025 ( Expired 135 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh

Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh

Read more
Consultancy services for authoritys engineer for supervision of construction of a-vop at manegaon village at km 468.260 (wainganga bridge to mh/cg border section of nh-53) and b-vop at km 120.213 at basamba phata (washim-pangare section of on nh-161

Consultancy services for authoritys engineer for supervision of construction of a-vop at manegaon village at km 468.260 (wainganga bridge to mh/cg border section of nh-53) and b-vop at km 120.213 at basamba phata (washim-pangare section of on nh-161

Read more
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh

Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh

Read more
Construction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle.

Construction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle

Read more
Fdr mtc. of road from old agartala-chandrapur road to bro bypass road via west champamura tribal basti (l 2.70 km) under khayerpur pwd(r and b) sub-division during the year 2025-26 sh construction of 01 (one) no rcc boxcell (3.00 x 3.00 mtr)

Fdr mtc. of road from old agartala-chandrapur road to bro bypass road via west champamura tribal basti (l 2.70 km) under khayerpur pwd(r and b) sub-division during the year 2025-26 sh construction of 01 (one) no rcc boxcell (3.00 x 3.00 mtr)

Read more
Mtc. of pmgsy road from shibsankar para to asta jungal under jirania sub division pwd (r and b) during the year 2025-2026 sh grouting, metalling patch carpetting, seal coat, etc. (l 1.97 km, from ch.0.00 mtr to ch.1970.00 mtr).

Mtc. of pmgsy road from shibsankar para to asta jungal under jirania sub division pwd (r and b) during the year 2025-2026 sh grouting, metalling patch carpetting, seal coat, etc. (l 1.97 km, from ch.0.00 mtr to ch.1970.00 mtr).

Read more
Fdr mtc. of road from ranirgaon (karaibon) to jarulbachai via bagbari, babaniapara (l 9.56 km) under khayerpur pwd(r and b) sub division during the year 2025-26 sh construction of 01 (one) no rcc box cell (4.00 x 4.00 mtr) at ch. 8.25 km.

Fdr mtc. of road from ranirgaon (karaibon) to jarulbachai via bagbari, babaniapara (l 9.56 km) under khayerpur pwd(r and b) sub division during the year 2025-26 sh construction of 01 (one) no rcc box cell (4.00 x 4.00 mtr) at ch. 8.25 km.

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Construction of new embankment and 4 lane road between shaheed path and kisan path on rhs bank of gomti river in lucknow, in the state of uttar pradesh

Construction of new embankment and 4 lane road between shaheed path and kisan path on rhs bank of gomti river in lucknow, in the state of uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise