Tender Details

Particulars Details
Title
Construction Of Roof Shead On 2nd Floor For Godown At New Gp Building,Part 1
Description
Construction Of Roof Shead On 2nd Floor For Godown At New Gp Building,Part 1
Organisation Zilla Parishad | State Govt. and UT
Tender Id 2024_ZPHD_752969_2
Reference
Number
07 OF 2024-2025
Tender Fee 500
EMD 7000
Tender Value
Place PANCHET
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1664229

Start Date September 18, 2024 23:30
End Date
Expired 27/09/2024

Expired 658 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Development of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works

Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works

Read more
Construction of 04 technical building at cad pulgaon under ge pulgaon

Construction of 04 technical building at &#x0d cad pulgaon under ge pulgaon&#x0d

Read more
Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal

Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal

Read more
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Plantation and maintenance of plants at maharana pratap khel gaon for 1-year (2026-2027) 2811

Plantation and maintenance of plants at maharana pratap khel gaon for 1-year (2026-2027) 2811

Read more
Construction of certain technical, administrative and married / single living accn with connected services at af stn deesa under ph-ii (designated as gp-iii)

Construction of certain technical, &#x0d administrative and married / single living &#x0d accn with connected services at af stn &#x0d deesa under ph-ii (designated as gp-iii)

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Construction of separate toilet and urinal and shead for gp meeting hall on 2nd floor

Construction of separate toilet and urinal and shead for gp meeting hall on 2nd floor

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise