Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Eco Cultural Park Phase Ii Main Market Leh P Art B
|
Description |
Construction Of Eco Cultural Park Phase Ii Main Market Leh P Art B
|
Organisation | Union Territory of Ladakh |
Tender Id | 2023_LAHD_10829_2 |
Reference Number |
E tender 10 of 2023-24 |
Tender Fee | 3000 |
EMD | 4.37 Lakh |
Tender Value | |
Place | Office of the CEO,LDA,Leh |
Link | https://tenders.ladakh.gov.in |
Start Date | August 25, 2023 21:35 |
End Date |
09/09/2023 ( Expired 663 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreProvn of md accn (phase-ii of two phases) at missamari under ge missamari
Provn of md accn (phase-ii of two phases) at missamari under ge missamari
Read moreProviding laying and jointing of trunk main lines along with manholes part 1 for sewerage work in bambala area sanganer under ee phe i jda jaipur
Providing laying and jointing of trunk main lines along with manholes part 1 for sewerage work in bambala area sanganer under ee phe i jda jaipur
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Read moreDes, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreConsultancy services for authoritys engineer for supervision of construction of a-vop at manegaon village at km 468.260 (wainganga bridge to mh/cg border section of nh-53) and b-vop at km 120.213 at basamba phata (washim-pangare section of on nh-161
Consultancy services for authoritys engineer for supervision of construction of a-vop at manegaon village at km 468.260 (wainganga bridge to mh/cg border section of nh-53) and b-vop at km 120.213 at basamba phata (washim-pangare section of on nh-161
Read moreof your Industry type