Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Mini Super Mark Near Moti Market Leh ( Balance Work )
|
| Description |
Construction Of Mini Super Mark Near Moti Market Leh ( Balance Work )
|
| Organisation | Public Works Department | Chief Engineer PW(R and B) - Ladakh | PWD Department - Leh | R and B Leh |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 500 |
| EMD | 30200 |
| Tender Value | 15.1 Lakh |
| Place | Ladakh |
| Link | Login to view |
| Start Date | September 29, 2026 23:30 |
| End Date |
Closing soon
15/10/2026
1 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Corrigenda & Amendments (2)
The issuing authority has issued modifications/date extensions for this tender.
Extend date
Date extend
Balance works of internal electrical work for re construction of district commissioner office leh
Balance works of internal electrical work for re construction of district commissioner office leh
Read moreLaying of balance concrete cement ( cc ) at market yard racharla boppapur of rajanna siricilla district.
Laying of balance concrete cement ( cc ) at market yard racharla boppapur of rajanna siricilla district.
Read moreRepair work of 01 toilet in kisan bazaar (super market) near gate no 4 on rajwahe road in nmy muzaffarnagar
Repair work of 01 toilet in kisan bazaar (super market) near gate no 4 on rajwahe road in nmy muzaffarnagar
Read moreStrengthening of bituminous roads and parking of main market in sector 7 and 16, ward no. 3 , panchkula. (balance work )
Strengthening of bituminous roads and parking of main market in sector 7 and 16, ward no. 3 , panchkula. (balance work )
Read moreGeneral-gac pariyaram - construction of type 1 quarters--construction of mini family/ singles/bachelors quarters (1bhk) at govt.ayurveda college pariyaram-balance electrification
General-gac pariyaram - construction of type 1 quarters--construction of mini family/ singles/bachelors quarters (1bhk) at govt.ayurveda college pariyaram-balance electrification
Read moreSpecial repair of balance works of lok nayak bhawan building khan market under bm-pk division sh various miscellaneous repair works in facade and construction of brick parapet wall at terrace of lok nayak bhawan building khan market new delhi
Special repair of balance works of lok nayak bhawan building khan market under bm-pk division sh various miscellaneous repair works in facade and construction of brick parapet wall at terrace of lok nayak bhawan building khan market new delhi
Read moreAnnual plan-2026-27 tirurangadi municipality project no-169/27 interlocking work for pangottu padam mini bypass road balance portion in ward no. 35-tiroorangadi muncipality-general civil work
Annual plan-2026-27 tirurangadi municipality project no-169/27 interlocking work for pangottu padam mini bypass road balance portion in ward no. 35-tiroorangadi muncipality-general civil work
Read moreRepair work of the animal service centre and the construction of urinals/toilets (including water supply) at two locations within the kisan bazaar for the traders occupying the shops built in the super market or kisan bazaar at nmy muzaffernagar
Repair work of the animal service centre and the construction of urinals/toilets (including water supply) at two locations within the kisan bazaar for the traders occupying the shops built in the super market or kisan bazaar at nmy muzaffernagar
Read moreBrake test arrangement with two spring balance of 0 to 25 kg rating,halogen incandescent lamp with holder , choke , capacitor,low-pressure sodium lamp with holder , choke , capacitor,rcc pole with accessories and materials 6 meter,magnetic flux mete 0-500 tesla,star delta strater manual for ac motor 2 to 5 hp,star delta strater soft starter for ac motor 2 to 5 hp,motor ac single phase 230 v, 50 cycles capacitor type with starter switch 1 hp.,coil winding machine manual with step arbor,shaded pole motor fractional hp, 240 v, 50 hz,single phase smart energy meter,three phase smart energy meter,variable auto transformer 0-270 v 10a air cooled,network switch 24 port,mini dongle for bluetooth devices connection
Brake test arrangement with two spring balance of 0 to 25 kg rating,halogen incandescent lamp with holder , choke , capacitor,low-pressure sodium lamp with holder , choke , capacitor,rcc pole with accessories and materials 6 meter,magnetic flux mete 0-500 tesla,star delta strater manual for ac motor 2 to 5 hp,star delta strater soft starter for ac motor 2 to 5 hp,motor ac single phase 230 v, 50 cycles capacitor type with starter switch 1 hp.,coil winding machine manual with step arbor,shaded pole motor fractional hp, 240 v, 50 hz,single phase smart energy meter,three phase smart energy meter,variable auto transformer 0-270 v 10a air cooled,network switch 24 port,mini dongle for bluetooth devices connection
Read moreConstruction of mini super mart near moti market leh ( under sdp )
Construction of mini super mart near moti market leh ( under sdp )
Read moreof your Industry type