Tender Details
Particulars | Details |
---|---|
Title |
Cleaning And Removal Of Scattered / Side Fallen Coal Along 8 Dip And 4 Rise Main Airways Galleries Of 4 A (Bottom) Seam At Haldibari Ug Mine
|
Description |
Cleaning And Removal Of Scattered / Side Fallen Coal Along 8 Dip And 4 Rise Main Airways Galleries Of 4 A (Bottom) Seam At Haldibari Ug Mine
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_303013_1 |
Reference Number |
AGM/HSD/GM(O)/e-Tend/23-24/202 dtd 29.02.2024 |
Tender Fee | 0 |
EMD | 44600 |
Tender Value | |
Place | Hasdeo Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=313883 |
Start Date | February 29, 2024 23:30 |
End Date |
11/03/2024 ( Expired 440 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of cable tray with support hanger in 132 kv main and side cable trenches with interior renovation of cable trenches along with painting work of 132 kv and 33 kv structures and equipment at 132/33 kv gss, jadugoda
Installation of cable tray with support hanger in 132 kv main and side cable trenches with interior renovation of cable trenches along with painting work of 132 kv and 33 kv structures and equipment at 132/33 kv gss, jadugoda
Read moreRepair / maint of water supply lines incl rising main, pipe lines, valves, valve chambers incl repair/maint of pumps, starters, cleaning ug sumps and ohts and repair/ maint of internal electrification works at otm accn and all adm bldgs of jakli rc
Repair / maint of water supply lines incl rising main, pipe lines, valves, valve chambers incl repair/maint of pumps, starters, cleaning ug sumps and ohts and repair/ maint of internal electrification works at otm accn and all adm bldgs of jakli rc
Read moreConstruction of 12 nos. isolation stoppings of proposed depillaring panel vibe12 of burhar vi bottom seam at damni ug mine
Construction of 12 nos. isolation stoppings of proposed depillaring panel vibe12 of burhar vi bottom seam at damni ug mine
Read moreCreation of new sump of 44d/23xcut to 22xcut, 22xcut to 44d/43d and construction of 02 nos. pump foundation at mk seam at bhadra 7/8 mine, bhadra sub area, jamuna kotma area.
Creation of new sump of 44d/23xcut to 22xcut, 22xcut to 44d/43d and construction of 02 nos. pump foundation at mk seam at bhadra 7/8 mine, bhadra sub area, jamuna kotma area.
Read moreTo assist contractually extension of 800mm belt, electrical shifting and laying of power cable in underground at lhd e8 proposed depillaring panel of bagdona coal seam at tawa mine of pathakhera area, wcl.
To assist contractually extension of 800mm belt, electrical shifting and laying of power cable in underground at lhd e8 proposed depillaring panel of bagdona coal seam at tawa mine of pathakhera area, wcl.
Read moreConstruction of 5 nos. rcc sectionlization stopping in vi bottom seam at bangwar ug mine
Construction of 5 nos. rcc sectionlization stopping in vi bottom seam at bangwar ug mine
Read moreCleaning of strom water drains at surface and ug sumps and drain at diff level for mansoon prepratory works at kandri mine
Cleaning of strom water drains at surface and ug sumps and drain at diff level for mansoon prepratory works at kandri mine
Read moreHeightening and roof bolting in d-18 bg between 7th dip to drift(xvi top) and in 6th dip , e-8 tg inside the 6th dip of xvi(b) seam at moonidih colliery, w j area
Heightening and roof bolting in d-18 bg between 7th dip to drift(xvi top) and in 6th dip , e-8 tg inside the 6th dip of xvi(b) seam at moonidih colliery, w j area
Read moreCleaning of drain from shiv mandir mine junction to sector 8 mq and pond near security barrack and back side of mq sector 3 at nigahi township
Cleaning of drain from shiv mandir mine junction to sector 8 mq and pond near security barrack and back side of mq sector 3 at nigahi township
Read moreLaying of 8 inches additional pipe range at new eastern side sump for continuous dewatering sump water in order to extract ob/coal from 3rd-4th seam under jocp under hzb area
Laying of 8 inches additional pipe range at new eastern side sump for continuous dewatering sump water in order to extract ob/coal from 3rd-4th seam under jocp under hzb area
Read moreof your Industry type