Tender Details

Particulars Details
Title
Malma Cleaning And Removal Of Scattered / Side Fallen Coal Along Inc.No 3, 4 R , 18 L , 19 L Main Return Airways Galleries Of 4 A Seam At Haldibari Ug Mine.
Description
Malma Cleaning And Removal Of Scattered / Side Fallen Coal Along Inc.No 3, 4 R , 18 L , 19 L Main Return Airways Galleries Of 4 A Seam At Haldibari Ug Mine.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_331573_1
Reference
Number
AGM/HSD/SO(M)/e-Tend/24-25/160 dtd 07.03.2025
Tender Fee 0
EMD 49200
Tender Value
Place SECL Hasdeo Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343719
Start Date March 07, 2025 23:30
End Date

19/03/2025 ( Expired 54 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Cleaning of spillage coal/shale along all running belts of bagdona seam and lower workable seam at tawa mine, pathakhera area, wcl

Cleaning of spillage coal/shale along all running belts of bagdona seam and lower workable seam at tawa mine, pathakhera area, wcl

Read more
Reconstruction of 6 nos. isolation stoppings by rcc and replaster of 50 no. old isolation stoppings in depillared panels of seam ii and cleaning of fallen coal in old galleries at naheriya underground mine of pench area

Reconstruction of 6 nos. isolation stoppings by rcc and replaster of 50 no. old isolation stoppings in depillared panels of seam ii and cleaning of fallen coal in old galleries at naheriya underground mine of pench area

Read more
Deployment of 1 jcb, 2 nos pc-210 along with 4 nos trucks for cleaning of drain and removal of heaps lying along the coal transportation road at dipka expansion project of dipka area

Deployment of 1 jcb, 2 nos &#x0d pc-210 along with 4 nos trucks &#x0d for cleaning of drain and removal &#x0d of heaps lying along the coal &#x0d transportation road at dipka &#x0d expansion project of dipka &#x0d area

Read more
Cleaning and removal of muck/debries from 29l sump and 35l sump at 10b (top) seam at haldibari ug mine.

Cleaning and removal of muck/debries from 29l sump and 35l sump at 10b (top) seam at haldibari ug mine.

Read more
Shifting of 06 nos. of transformer tsu315kva, 3.3 kv / 570v with all electrical equipments and shifting of main acb, coupled acb for proposed development and depillaring panels at seam vii and vi(b) khairaha ug mine

Shifting of 06 nos. of transformer tsu315kva, 3.3 kv / 570v with all electrical equipments and shifting of main acb, coupled acb for proposed development and depillaring panels at seam vii and vi(b) khairaha ug mine

Read more
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine

Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine

Read more
Malma cleaning, removal of debris from main sump in 5d/10l in 10b seam of 7/8 incline at rajnagar ro colliery of hasdeo area

Malma cleaning, removal of debris from main sump in 5d/10l in 10b seam of 7/8 incline at rajnagar ro colliery of hasdeo area

Read more
Construction of cement concrete road with toe wall and side drain around the coal stock yard at gayatri ug mine for compliance of ec and cte/cto condition of rgk sub area at bishrampur area.

Construction of cement concrete road with toe wall and side drain around the coal stock yard at gayatri ug mine for compliance of ec and cte/cto condition of rgk sub area at bishrampur area.

Read more
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla

Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla

Read more
(i) cleaning of garland drain, pacca drain near pit office and base workshop (ii) kutcha catch drain cutting along haul road (iii) hume pipe laying at 3 different location at kathara mine under kathara colliery, kta

(i) cleaning of garland drain, pacca drain near pit office and base workshop (ii) kutcha catch drain cutting along haul road (iii) hume pipe laying at 3 different location at kathara mine under kathara colliery, kta

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise