Tender Details
Particulars | Details |
---|---|
Title |
Side / Roof Dressing And Cleaning Of Fallen Material Along Travelling Roadway From 16 R To 35 R Along 77 Ln Old Gallery For New Travelling Roadway For Re Organization Of Belt And Travelling Roadway In 4 A Seam At Jhiria Ug Mine.
|
Description |
Side / Roof Dressing And Cleaning Of Fallen Material Along Travelling Roadway From 16 R To 35 R Along 77 Ln Old Gallery For New Travelling Roadway For Re Organization Of Belt And Travelling Roadway In 4 A Seam At Jhiria Ug Mine.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_324236_1 |
Reference Number |
AGM/HSD/SO(M)/e-Tend/24-25/119 dtd 27.12.2024 |
Tender Fee | 0 |
EMD | 11400 |
Tender Value | |
Place | SECL Hasdeo Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336096 |
Start Date | December 27, 2024 23:30 |
End Date |
08/01/2025 ( Expired 103 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.
Widening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.
Read moreRegular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine
Read moreInstallation 800mm belt from 15r to 36r along -78l, -78l to-90l along 35r and dismantling of 800mm belt from 15r to 36r along -90l, dismantling of 1000mm belt from -79l to -91l in 44 seam for re-organization of belt circuit from drift and strata bunk
Installation 800mm belt from 15r to 36r along -78l, -78l to-90l along 35r and dismantling of 800mm belt from 15r to 36r along -90l, dismantling of 1000mm belt from -79l to -91l in 44 seam for re-organization of belt circuit from drift and strata bunk
Read moreInstallation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreMaking of drain along main riding from -46l to -32l/14r fo drainage of water towards -32l sump in 4a seam at jhiria ug mine.
Making of drain along main riding from -46l to -32l/14r fo drainage of water towards -32l sump in 4a seam at jhiria ug mine.
Read moreDismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0
Dismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0
Read moreMalma cleaning and removal of scattered / side fallen coal along inc.no-3, 4r , 18l , 19l main return airways galleries of 4a seam at haldibari ug mine.
Malma cleaning and removal of scattered / side fallen coal along inc.no-3, 4r , 18l , 19l main return airways galleries of 4a seam at haldibari ug mine.
Read moreCleaning and extraction of old damage pipe of existing vertical borehole no 16 from surface to dobrana rv seam 1west dip 11l and also lowering of new pipe including casing pipe in place of old damage pipe for dewatering no 6 pit wrokings of dobrana r
Cleaning and extraction of old damage pipe of existing vertical borehole no 16 from surface to dobrana rv seam 1west dip 11l and also lowering of new pipe including casing pipe in place of old damage pipe for dewatering no 6 pit wrokings of dobrana r
Read moreCleaning and stacking of fallen coal with white washing along 23l from 0 dip to 17 dip in s.p. combine seam for emergency escape route of pumping operation under kumardhubi colliery.
Cleaning and stacking of fallen coal with white washing along 23l from 0 dip to 17 dip in s.p. combine seam for emergency escape route of pumping operation under kumardhubi colliery.
Read moreWork of white washing and stone dust spreading in ug gallery from incline mouth to working panel including haulage and travelling roadway and statutory stations etc. at vijay west ug mine
Work of white washing and stone dust spreading in ug gallery from incline mouth to working panel including haulage and travelling roadway and statutory stations etc. at vijay west ug mine
Read moreof your Industry type