Tender Details

Particulars Details
Title
Side / Roof Dressing And Cleaning Of Fallen Material Along Travelling Roadway From 16 R To 35 R Along 77 Ln Old Gallery For New Travelling Roadway For Re Organization Of Belt And Travelling Roadway In 4 A Seam At Jhiria Ug Mine.
Description
Side / Roof Dressing And Cleaning Of Fallen Material Along Travelling Roadway From 16 R To 35 R Along 77 Ln Old Gallery For New Travelling Roadway For Re Organization Of Belt And Travelling Roadway In 4 A Seam At Jhiria Ug Mine.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_SECL_324236_1
Reference
Number
AGM/HSD/SO(M)/e-Tend/24-25/119 dtd 27.12.2024
Tender Fee 0
EMD 11400
Tender Value
Place SECL Hasdeo Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336096
Start Date December 27, 2024 23:30
End Date

08/01/2025 ( Expired 103 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Widening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.

Widening and heightening of drift from seam-iii to seam-ii, 0le between incline no. 1 to incline no. 2 and cleaning of fallen coal gallery with support of roof in seam-iii of katkona 1 and 2 incline.

Read more
Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine

Regular cleaning of malma/debris/slurry from below and sides of 1000mm belt conveyor and tail end point of 15 no. incline mouth to underground upto 2l in 4a seam at jhiria ug mine

Read more
Installation 800mm belt from 15r to 36r along -78l, -78l to-90l along 35r and dismantling of 800mm belt from 15r to 36r along -90l, dismantling of 1000mm belt from -79l to -91l in 44 seam for re-organization of belt circuit from drift and strata bunk

Installation 800mm belt from 15r to 36r along -78l, -78l to-90l along 35r and dismantling of 800mm belt from 15r to 36r along -90l, dismantling of 1000mm belt from -79l to -91l in 44 seam for re-organization of belt circuit from drift and strata bunk

Read more
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla

Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla

Read more
Making of drain along main riding from -46l to -32l/14r fo drainage of water towards -32l sump in 4a seam at jhiria ug mine.

Making of drain along main riding from -46l to -32l/14r fo drainage of water towards -32l sump in 4a seam at jhiria ug mine.

Read more
Dismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0

Dismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0

Read more
Malma cleaning and removal of scattered / side fallen coal along inc.no-3, 4r , 18l , 19l main return airways galleries of 4a seam at haldibari ug mine.

Malma cleaning and removal of scattered / side fallen coal along inc.no-3, 4r , 18l , 19l main return airways galleries of 4a seam at haldibari ug mine.

Read more
Cleaning and extraction of old damage pipe of existing vertical borehole no 16 from surface to dobrana rv seam 1west dip 11l and also lowering of new pipe including casing pipe in place of old damage pipe for dewatering no 6 pit wrokings of dobrana r

Cleaning and extraction of old damage pipe of existing vertical borehole no 16 from surface to dobrana rv seam 1west dip 11l and also lowering of new pipe including casing pipe in place of old damage pipe for dewatering no 6 pit wrokings of dobrana r

Read more
Cleaning and stacking of fallen coal with white washing along 23l from 0 dip to 17 dip in s.p. combine seam for emergency escape route of pumping operation under kumardhubi colliery.

Cleaning and stacking of fallen coal with white washing along 23l from 0 dip to 17 dip in s.p. combine seam for emergency escape route of pumping operation under kumardhubi colliery.

Read more
Work of white washing and stone dust spreading in ug gallery from incline mouth to working panel including haulage and travelling roadway and statutory stations etc. at vijay west ug mine

Work of white washing and stone dust spreading in ug gallery from incline mouth to working panel including haulage and travelling roadway and statutory stations etc. at vijay west ug mine

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise