Tender Details
Particulars | Details |
---|---|
Title |
Carrying Out Falling Weight Deflectometer Test And Other Necessary Field Works And Calculations For Preparation Of Detailed Project Report For The Work Of Strengthening Of Suri Md.Bazar Road From 0kmp To 5.60 Kmp Under Birbhum Division Pwd 2nd Call
|
Description |
Carrying Out Falling Weight Deflectometer Test And Other Necessary Field Works And Calculations For Preparation Of Detailed Project Report For The Work Of Strengthening Of Suri Md.Bazar Road From 0kmp To 5.60 Kmp Under Birbhum Division Pwd 2nd Call
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2025_WBPWD_798804_1 |
Reference Number |
WBPWD/AE/SURI/NIeT-27/2024-25 |
Tender Fee | 0 |
EMD | 10000 |
Tender Value | |
Place | SURI |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1772886 |
Start Date | January 13, 2025 17:30 |
End Date |
22/01/2025 ( Expired 90 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply erection and commissioning of eot cranes for flood protection works at tail regulator permanent pump house at jassiya drain out falling into drain no-8 in water services mechanical division, rohtak.
Supply erection and commissioning of eot cranes for flood protection works at tail regulator permanent pump house at jassiya drain out falling into drain no-8 in water services mechanical division, rohtak.
Read moreAssistance in works for carrying out operation and maintenance of gas turbine and steam turbine along with water system including dm plant pt plant and etp plant including various related field activities
Assistance in works for carrying out operation and maintenance of gas turbine and steam turbine along with water system including dm plant pt plant and etp plant including various related field activities
Read morePreparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under u.d. division, p.w.d.(2nd call)
Preparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under u.d. division, p.w.d.(2nd call)
Read morePreparation of ppt, details project report, falling weight deflectometer test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with strengthening of kaliachak golapganj
Preparation of ppt, details project report, falling weight deflectometer test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with strengthening of kaliachak golapganj
Read moreConsultancy services for carrying out feasibility study and preparation of detailed project report for construction improvement of road baripattan jhallas from km 103.700 to 210.00 in 31 brtf area under project sampark in j k
Consultancy services for carrying out feasibility study and preparation of detailed project report for construction improvement of road baripattan jhallas from km 103.700 to 210.00 in 31 brtf area under project sampark in j k
Read moreAssistance in carrying out miscellaneous routine works for prive maintenance of 132kv almora-pithoragarh line, 132kv d/c chandak-pithoragarh line, 132kv chandak-lohaghat line and 132kv ranikhet-bageshwar line under oandm division, ptcul, almora
Assistance in carrying out miscellaneous routine works for prive maintenance of 132kv almora-pithoragarh line, 132kv d/c chandak-pithoragarh line, 132kv chandak-lohaghat line and 132kv ranikhet-bageshwar line under oandm division, ptcul, almora
Read moreSp.124 nctps ii es circle c i division fsss sub division unit i and ii sg fsss system carrying out running maintenance works of c i equipment in unit i and ii sg fsss system and allied areas for the period up to 31st march 2026 from the date
Sp.124 nctps ii es circle c i division fsss sub division unit i and ii sg fsss system carrying out running maintenance works of c i equipment in unit i and ii sg fsss system and allied areas for the period up to 31st march 2026 from the date
Read moreSp.128 nctps ii es circle ci division lab subdivision unit i and ii lab system and allied areas carrying out maintenance works of c i equipment s for the period up to 31 march 2026 from the date of taking over of site
Sp.128 nctps ii es circle ci division lab subdivision unit i and ii lab system and allied areas carrying out maintenance works of c i equipment s for the period up to 31 march 2026 from the date of taking over of site
Read morePreparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under uttar dinajpur division, p.w.d.
Preparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under uttar dinajpur division, p.w.d.
Read moreWbpwd/ee/asndvn/eniq10/2024-25
Carrying out falling weight deflectometer fwd test, 7 days traffic survey, axle load test, sub soil exploration and other necessary field works and calculations for preparation of comprehensive detailed project report ...under asansol division, pwd.
Read moreof your Industry type