Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Carrying Out Falling Weight Deflectometer Test And Other Necessary Field Works And Calculations For Preparation Of Detailed Project Report For The Work Of Strengthening Of Suri Md. Bazar Road From 0.00 Kmp To 5.600 Kmp Under Birbhum Division, Pwd
|
| Description |
Carrying Out Falling Weight Deflectometer Test And Other Necessary Field Works And Calculations For Preparation Of Detailed Project Report For The Work Of Strengthening Of Suri Md. Bazar Road From 0.00 Kmp To 5.600 Kmp Under Birbhum Division, Pwd
|
| Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
| Tender Id | 2024_WBPWD_786829_1 |
|
Reference Number |
WBPWD/AE/SURI/NIeT-20/2024-25 |
| Tender Fee | 0 |
| EMD | 10000 |
| Tender Value | - |
| Place | SURI |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1744459 |
| Start Date | December 19, 2024 17:30 |
| End Date |
Expired
30/12/2024
Expired 607 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Carrying out falling weight deflectometer test and other necessary field works and calculations for preparation of detailed project report for the work of strengthening of suri md.bazar road from 0kmp to 5.60 kmp under birbhum division pwd 2ndcall
Carrying out falling weight deflectometer test and other necessary field works and calculations for preparation of detailed project report for the work of strengthening of suri md.bazar road from 0kmp to 5.60 kmp under birbhum division pwd 2ndcall
Read moreEmergent work of decorating of kni avenue (vip road) along with necessary painting work from 0.00 kmp. to 1.00 kmp. (airport flank)
Emergent work of decorating of kni avenue (vip road) along with necessary painting work from 0.00 kmp. to 1.00 kmp. (airport flank)
Read morePreparation of detailed project report for resectioning from 0.00 kmp galgalia to 0.50 kmp, strengthening from 0.50 kmp to 8.200 kmp and 15.00 kmp to 15.50 km pani tanki and widening and strengthening from 8.20 kmp to 15.00 kmp of nh 327 old nh 31c
Refer to boq
Read moreRain damaged repairing work at suri dubrajpur chinpai village road from 0.500 kmp to 1.600 kmp, 2.30 kmp to 2.700 kmp in stretches by repairing potholes and 20mm premix carpet and seal coat type b etc. under birbhum division, p.w.d. in the
Rain damaged repairing work at suri dubrajpur chinpai village road from 0.500 kmp to 1.600 kmp, 2.30 kmp to 2.700 kmp in stretches by repairing potholes and 20mm premix carpet and seal coat type b etc. under birbhum division,
Read moreConsultancy work for preparation of detailed project report dpr for strengthening work manikganj satkura road from 0.00 kmp to 5.10 kmp manikganj police camp to satkura bsf camp under jalpaiguri division pwd during the year 2024_25
Consultancy work for preparation of detailed project report dpr for strengthening work manikganj satkura road from 0.00 kmp to 5.10 kmp manikganj police camp to satkura bsf camp under jalpaiguri division pwd during the year 2024_25
Read morePreparation and submission of report of falling weight deflectometer analysis and traffic census with axel load survey for preparation of dpr of proposed work widening and strengthening of nandigram chandipur road from 00.000 km to 16.000 km
Preparation and submission of report of falling weight deflectometer analysis and traffic census with axel load survey for preparation of dpr of proposed work widening and strengthening of nandigram chandipur road from 00.000 km to 16.000 km
Read morePreparation of ppt, details project report, falling weight deflectometer test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with strengthening of kaliachak golapganj
Preparation of ppt, details project report, falling weight deflectometer test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with strengthening of kaliachak golapganj
Read moreImprovement and strengthening of link road from lower samnal to pubowal via baliwal km 0/00 to 11/470 sh preparation of detailed project report, falling weight deflectometer test using fwd equipment, axle load traffic survey and cbr test
Improvement and strengthening of link road from lower samnal to pubowal via baliwal km 0/00 to 11/470 sh preparation of detailed project report, falling weight deflectometer test using fwd equipment, axle load traffic survey and cbr test
Read moreDetailed project report for construction of four lanning road from ajouli mod to bulk drug park stie at village polian beet tehsil haroli distt.una sh preparation of layout plan as per land acquisition, falling w eight deflectometer test, axle load s
Detailed project report for construction of four lanning road from ajouli mod to bulk drug park stie at village polian beet tehsil haroli distt.una sh preparation of layout plan as per land acquisition, falling w eight deflectometer test, axle load s
Read moreRepairing and new installation works of compound lighting and new installation of split ac machine at doctors rest room along with necessary ei works in view of rattirer sathi scheme at suri super speciality hospital, birbhum. (rattirer sathi)
Repairing and new installation works of compound lighting and new installation of split ac machine at doctors rest room along with necessary ei works in view of rattirer sathi scheme at suri super speciality hospital, birbhum. (rattirer sathi)
Read moreof your Industry type