Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Annual Plan Project 275/25 26 Pre Monsoon Cleaning Of Thodu Kottaram Thodu At Palce Ward From East Of General Hospital To Kottaram Palam General Civil Work
|
Description |
Annual Plan Project 275/25 26 Pre Monsoon Cleaning Of Thodu Kottaram Thodu At Palce Ward From East Of General Hospital To Kottaram Palam General Civil Work
|
Organisation | Local Self Government Department | State Govt. and UT |
Tender Id | 2025_LSGD_767695_1 |
Reference Number |
T3/275/13/ME/LSGD/AMC/2025 |
Tender Fee | 335 |
EMD | 975 |
Tender Value | |
Place | ALAPPUZHA MUNCIPALITY |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1251670 |
Start Date | June 04, 2025 21:30 |
End Date |
12/06/2025 ( Expired 22 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of c.c. road work at prathamik vidhyalay to kamal singh ka pura zone 25.ward no.66 file no.202/25x3/6.
Construction of c.c. road work at prathamik vidhyalay to kamal singh ka pura zone 25.ward no.66 file no.202/25x3/6.
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreAnnual maintenance and repair of colony roads at madhuban area along with the main road from atharabanki to police station square for the year 2025-26
Annual maintenance and repair of colony roads at madhuban area along with the main road from atharabanki to police station square for the year 2025-26
Read moreConstruction of b.t. road work at m.h. choraha to baradari choraha mura ward no. 26 zone no. 09 file no. 30/25x3/5
Construction of b.t. road work at m.h. choraha to baradari choraha mura ward no. 26 zone no. 09 file no. 30/25x3/5
Read moreAAAAAAAAAA
Login to viewProtection work by uc bullah on chak fulbubi culvert to protect from heavy scouring on kachuberia - gangasagar road at sagar island under diamond harbour highway division during the year 2025-26
Read moreConstruction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur-- sitc of dg set
Construction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur. --sitc of dg set
Read morePainting work in outside n inside face of cut and cover approach, railing of power house, trc, flared wall, intake structure,fencing panel from main gate to switch yard area and in switch yard area etc ic civil r and m work of qtrs at 3x20mw, mhps
Painting work in outside n inside face of cut and cover approach, railing of power house, trc, flared wall, intake structure,fencing panel from main gate to switch yard area and in switch yard area etc ic civil r and m work of qtrs at 3x20mw, mhps
Read moreWard-26 construction work of rcc drain from adinath chowk 100 phuta tirahe via madan mohan malviya colony to room on pilibhit road and from 100 phuta tirahe to delapir sumpwell.
Ward-26 construction work of rcc drain from adinath chowk 100 phuta tirahe via madan mohan malviya colony to room on pilibhit road and from 100 phuta tirahe to delapir sumpwell.
Read moreWard-26 construction work of rcc drain from kanjadpur turn to kurmanchalnagar gate no. 01 till the culvert in front of neel kamal room and from khalsa school via mandi till 100 feet square.
Ward-26 construction work of rcc drain from kanjadpur turn to kurmanchalnagar gate no. 01 till the culvert in front of neel kamal room and from khalsa school via mandi till 100 feet square.
Read moreof your Industry type