Tender Details

Particulars Details
Title
Stage 2 Sub Division Budgam
Description
Sub Division Budgam Stage 2 1)charangam Murshulla 5.00 Km 2)raithan Kachwari 3.50 Km 3)mujpathri Basantwuder 2.00 Km 4)arigam Hassigund 3.50 Km
Organisation National Rural Road Development Agency (NRRDA)
Tender Id 2023_KSRRD_129205_2
Reference
Number
11/EE/PMGSY/B/DB/2023-24
Tender Fee 500
EMD 5000
Tender Value -
Place Office of the Executive Engineer PMGSY Div.Budgam
Link
View Original Tender Notice

https://pmgsytenders.gov.in

Start Date November 14, 2023 14:30
End Date
Expired 20/11/2023

Expired 1041 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.

Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.

Read more
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.

Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.

Read more
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds

Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds

Read more
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.

Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.

Read more
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Read more
Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2

Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2

Read more
Godavari pushkaralu-2027-road to b/w of nh63(sub station) haritha hotel via smashana vatika in dharmapuri muncipality (80ft road) of jagitial district est.cost.rs.600.00 lakhs

Godavari pushkaralu-2027-road to b/w of nh63(sub station) haritha hotel via smashana vatika in dharmapuri muncipality (80ft road) of jagitial district est.cost.rs.600.00 lakhs

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Outsourcing contract for dismantling and laying of 3.3kv and 230v oht lines at gdkcm (no.2,2a and 5), rg.i area for a period of 2 years on rate contract basis

Outsourcing contract for dismantling and laying of 3.3kv and 230v oht lines at gdkcm (no.2,2a and 5), rg.i area for a period of 2 years on rate contract basis

Read more
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.

Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise